My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20585
COE
>
City of Eugene
>
Ordinances
>
2017 No. 20572 - 20587
>
Ordinance No. 20585 w/Exhibits
>
Ordinance No. 20585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2017 9:05:08 AM
Creation date
11/15/2017 8:57:17 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20585
Document_Title
Ordinance Establishing the Sufficiency of the Urban Growth Boundary for Residential Land
Adopted_Date
7/17/2017
Approved Date
7/24/2017
Signer
Piercy
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capacity Method 1: Relatively Flat LDR and All MDR & HDR <br />Capacity Method 1 was used to determine the capacity of most of <br />Eugene's current residential land supply. It was used to estimate capacity <br />of LDR land that is relatively flat and all MDR and HDR. Table 32 shows <br />the categories of land included in Capacity Method 1 in green highlight: <br />• LDR land that is vacant or partially vacant in all lot sizes46 with a <br />slope of 5% or less and below 900 feet in elevation. In parcels of less <br />than one acre, the analysis applies only to vacant land. <br />MDR land that is vacant or partially vacant in all lot sizes47 at all <br />slopes and elevations. <br />HDR land that is vacant or partially vacant in all lot sizes48 at all <br />slopes and elevations. <br />Table 32. Capacity method by category of land, with land included in <br />Capacity Method 1 shown in green highlight <br />Low Densit Residential <br />Medium Density Residential <br />High Densi <br />Residential <br />< 900, <br />> 900, <br />< 900, <br />> 900, <br />< 900, > 900, <br />Slope <5% >_5 % <5% >_5% <br /><5% >_5% <br /><5% >_5% <br /><5% >_5% <br /><5% >_5% <br />< 1 acre* 1 3 <br />3 3 <br />1 1 <br />1 1 <br />1 1 <br />1 1 <br />1-5 acre 1 2 <br />2 2(V) <br />3 (PV) <br />1 1 <br />1 1 <br />1 1 <br />1 1 <br />5+ acre 1 2 <br />2 2 <br />1 1 <br />1 1 <br />1 1 <br />1 1 <br />*In parcels < 1 acre in LDR and HDR, this analysis applies to vacant land only. In parcels < 1 acre in MDR, this <br />analysis applies to vacant land < 1 acre and partially vacant parcels 0.5-< 1 acres. <br />Source: 2012 Residential Land Supply, City of Eugene <br />Capacity Method 1 is straightforward, multiplying the acres of buildable <br />land by the density assumption: <br />Buildable Land (ac) * Density (du/ac) = Capacity (du) <br />For example: <br />100 acres of buildable land * 6 du/ac = a capacity of 600 dwelling <br />units <br />For this method, the City uses the BLI's buildable land acreage ("Vacant" <br />acres and "Partially Vacant" acres), which excludes constrained land.49 <br />46 For parcels < 1 acre in LDR, this analysis applies to vacant land only <br />47 For parcels < 1 acre in MDR this analysis applies to vacant land and partially vacant parcels 0.5-1 <br />acres. <br />48 For parcels < 1 acre in LDR, this analysis applies to vacant land only. <br />49 As explained in Section 4.1.1, land that is committed, protected, fully developed, or above 30% <br />slope was considered "constrained" and, therefore, not included in the acreage used under <br />Capacity Method #1. The remaining land is referred to as "buildable land." <br />Page 120 ECONorthwest Part 11 — Eugene Housing Needs Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.