My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/20/1985 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1985
>
11/20/1985 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 10:01:22 PM
Creation date
11/2/2006 4:52:09 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
11/20/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> .t <br /> , <br /> 10th & Oak Overpark Improvement Proposal <br /> e Scope of \'Jork <br /> 1. Alley Improvements <br /> Goa 1 : Making the alley and adjacent plaza area more usable <br /> by adding parking and new lighting. <br /> Work will include addition of new pole lights, wheel stops, <br /> paint stripes and bollards and removal of some trees, planters, <br /> bollards, and steps. <br /> 2. Shop Fronts <br /> Goal: Making the shop fronts more colorful and interesting. <br /> Work wi 11 include removal or existing lights, sign boards and <br /> concrete walls, installation of new lighting and painting of <br /> wood storefronts, doors, plaster soffit and concrete overhead <br /> structure. <br /> 3. Ground Floor Lobbies <br /> Goal: Making the ground floor elevator lobbies more inviting. <br /> Work will include removal of existing light fixtures and install- <br /> e ation of new, installation of new floor and ceiling finish, re- <br /> moval of unused elevator entrance, installation of new wall fin- <br /> ish and resetting controls at elevator entrance. <br /> 4. Signing <br /> Goa 1 : Making the parking entrance and exit clearer and more <br /> festive. <br /> Work will include lighted canvas awnings at entrances and exit <br /> openings. <br /> 5. Upper Floor Lobbies <br /> Goal: Making the elevator and stair entrances more inviting. <br /> Work will include new lighting and floor finish, repainting and <br /> refinishing the wall at the elevator entrance. <br /> 6. Sta i rwe 11 s <br /> Goal: Making the stairways less forbidding. <br /> Work will include new lighting and graphics and repainting walls, <br /> handrails. doors and frames, underside of stair, piping and con- <br /> duits. Also included is replacing abrasive stips on stairs. <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.