My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 6: Ord.on Assess/Garden Way
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 06/13/05 Mtg
>
Item 6: Ord.on Assess/Garden Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:54:13 PM
Creation date
6/9/2005 11:37:22 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assessed for a maximum of 100 feet and a minimum of 50 feet of frontage. Properties that are greater <br /> than 1/2 acre and are partially developed with single family residential will be assessed for a maximum <br /> of 100 feet of frontage, with the remainder of the frontage assessment being delayed until further <br /> development occurs. Vacant properties over 1/2 acre were not levied an assessment with the LID. <br /> Assessment fees will be collected for these vacant properties when they are developed in the future. <br /> <br /> Costs listed below are the estimated assessment costs calculated at the time of the formation of the <br /> LID. A contingency was included in the estimate. <br /> <br /> Paving 7- foot (per front foot) $ 74.48 <br /> Paving 10-foot (per front foot) $ 106.39 <br /> Sidewalk (per square foot) $ 3.95 <br /> Wastewater (per square foot) $ 0.30 <br /> Wastewater service (per each) $ 3,650.30 <br /> <br /> Total Estimated Assessable Cost $ 927,261.89 <br /> Total Estimated City Cost $ 2,790,851.61 <br /> <br /> Total Estimated Project Cost $ 3,718,113.50 <br />Below are the final unit assessable costs: <br /> <br /> Paving 7- foot (per front foot). $ 71.65 <br /> Paving 10-foot (per front foot) $ 102.36 <br /> Sidewalk (per square foot) $ 3.90 <br /> Wastewater (per square foot) $ 0.27 <br /> Wastewater service (per each) $ 3,560.29 <br /> <br /> Total Assessable Cost $ 745,431.01 <br /> Total City Cost $ 2,868,564.48 <br /> <br /> Total Project Cost $ 3,613,995.49 <br /> <br />Of the assessable cost, $357,799.58 are delayed street assessments and $200,708.29 are on-hold <br />wastewater assessments. <br /> <br />Assessment financing, a 10-year payment plan through the City, is available to all property owners <br />within the improvement district as identified by City Code, Chapter 7. Of the 33 properties in the LID, <br />6 property owners qualify for the low-to-moderate income subsidy program. This program only <br />applies to owner-occupied properties in the LID. The City will pay in full for the subsidy share, 1 at <br />moderate income (1/3), 3 at low income (2/3), and 2 at very low income (5/6). The total cost for the <br />low income subsidies is $30,679.42. In addition, one property owner, Mr. Salomone, who does not <br />occupy his property in the LID, has appealed for an exception to the occupancy requirement so that he <br />can be included in the subsidy program, based on income alone. The hearing for his appeal is <br />scheduled immediately prior to the final assessment hearing. If the hearings official finds in favor of <br />Mr. Salamone, the total number of subsidies would be 7 and the cost of the subsidies would increase to <br />$35,459.06. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.