My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Tour of Eugene Water & Electric Board Riverfront Site and Discussion of Relocation Project
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 11/15/06 Work Session
>
Item A: Tour of Eugene Water & Electric Board Riverfront Site and Discussion of Relocation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:23 PM
Creation date
11/9/2006 10:49:07 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
issues and decisions that will need to be addressed. <br />Discussion. <br />Attachment A presents a timeline list of the significant issues and decisions that need to be <br />addressed to allow commencement of construction on the Roosevelt Project in 2007. The notes <br />below provide brief explanation and context for the various items on the timeline. <br />1.Design. The current schedule assumes completion of all design work (Design Development <br />and Construction Documents) by February 2008. Design Development is expected to be <br />85% complete by February 2006 allowing for completion of “Design Development Estimate” <br />(item 3c). <br />2.Determine Final Electric and Water Rate Assumptions. These questions and decisions <br />should be addressed by the Board prior to approval of any final cost estimate (item 3e) or <br />approval of a bond funding resolution (item 5b). <br />a.Determine Water Utility Cost Share. Estimates of rate impacts related to the <br />Roosevelt Project previous shared with the Board have assumed the traditional 86% <br />electric and 14% water split. Staff will review the Roosevelt plan to determine if that <br />cost sharing assumption is accurate or if another assumption should be considered. <br />b.Water Utility: Lease or Own? The Finance Department will provide background for <br />Board review and consideration on this question. <br />c.Include Riverfront Property Sale Price Assumption? The most recent estimate of <br />long-term water and electric rate impacts associated with the Roosevelt Project were <br />provided to the Board in June and assumed that some portion of the EWEB riverfront <br />property would be sold post-2013 and the proceeds would be used to offset project <br />debt service. We will provide the Board, for review and perspective, estimates with <br />and without this assumption on sale price. <br />3. Complete Final Cost Estimate. <br />a.Project Budget Estimate. This amount is $72.3 million and was approved by the <br />Board in June 2006 and includes a 5% reduction from the November 2005 30% <br />design estimate. <br />b.CM/GC Estimate.Completion of this estimate is expected in November 2006; it will <br />be compared to the project budget estimate (item 3e) and used to specify, resolve and <br />eliminate differences. The CM/GC estimate will also be referenced and adjusted by <br />the design team as we proceed with design development work. <br />c.Design Development Estimates. These estimates will be completed separately by the <br />Architect and the CM/GC in early March 2007 and will be based on the Design <br />Development work completed to that point (estimated to be about 85%). <br />d.Reconcile / Justify Estimates. Differences in the Design Development estimates (item <br />3c), as well as differences with the Project Budget estimate (item 3a), will be <br />reviewed and resolved, with the goal of completing a single project cost estimate that <br />can be brought to the Board for review and consideration. <br />e.Approve Final Estimate. This estimate will need to be consistent with the Project <br />Budget Estimate (item 3a) and any variation justified for and approved by the Board. <br /> This estimate will also need to include adequate contingencies and reserves to cover <br />any expected escalation of building construction costs in the 2008-09 period. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.