Laserfiche WebLink
4.Complete Permitting. We will need to secure, before any construction can begin in 2007, an <br />approved Fill and Removal Permit from the Corps of Engineers and the Oregon Department <br />of State lands, and permit approval from the City. <br />5. Financing Decisions <br />a.Authorize URBA Preparation. This is the “URBA or Ballot” question referenced <br />above. <br />b.Authorize URBA (EWEB Resolution). This is the formal decision to issue bonds for <br />construction funds using the URBA process. Board approval of a final cost estimate <br />(item 3e) would precede this authorization. This authorization would also refer this <br />question to the city council. <br />c.Authorize URBA (City Council Resolution). This is the council authorization <br />necessary to proceed with the URBA process (proceeded by item 5b). <br />d.URBA Remonstrance Period. This is the 60 day period during which 5% of the <br />registered voters in the City can petition to have the question referred to the ballot) or <br />refer the question to a ballot. This period can start immediately after council <br />authorization. <br />6. Construction Agreements <br />a.Consider “2 phase” GMP. Our current plan is to negotiate a Guaranteed Maximum <br />Price” (“GMP”) agreement with the CM/GC for construction of the project. As a <br />variation to using one GMP agreement for all construction, staff will want to review <br />with the Board the possibility of using two GMP agreements: (1) one agreement for <br />the initial earthwork portion (see item 7 below) of the project which would be <br />completed in late summer 2007; and (2) a second agreement for the building <br />construction which would start in early 2008. <br />b.Authorize Construction Agreement. This would be the Board authorization of the <br />necessary construction agreement with the CM/GC that will allow us to proceed. <br />7.Construction (earthwork). The initial construction necessary for the project includes <br />installation of the base roads and rock pads for the buildings, yard and parking areas. It also <br />includes installation of some underground substructure (conduit, pipes, vaults) necessary for <br />water, electric and on-site storm and sanitary sewer systems. Our current understanding is <br />this work would need to be competed by November 1 to comply with the Fill and Removal <br />permit requirements as well as adverse weather in the late fall. Completion of this work in <br />2007 would position us to start building construction by spring 2008 allowing for project <br />completion by mid-2009. <br />Recommendation / Requested Action. <br />There is no recommendation or requested action at this time. On November 7, I want to review this <br />material with the Board and discuss how best to work through them in the next few months. <br />Please call me with any questions or if you need additional information. <br />Attachment <br />3 <br />