My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
05-14-2018
>
CC Agenda Packet 05-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:02:38 PM
Creation date
5/11/2018 2:01:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />lifecycle using asset management tracking software. Based on this information, the three AMCP <br />program annual budgets are established and projected for the 5-Year Capital Plan. <br />For planning purposes, the MWMC must consider market changes that drive capital project <br />expenditures. Specifically, the MWMC capital plan reflects projected price changes over time <br />that affect the cost of materials and services. Until about 2003, the 20-city average Engineering <br />News RecordConstruction Cost Index (ENRCCI) served as a good predictor for future inflation <br />and was used for projecting the MWMC’s construction costs. Accordingly, construction cost <br />projections considered in the 2004 FP were based on January 2004, 20-city average ENRCCI. <br />However, in the period 2004 through 2008, construction inflation accelerated nationally with <br />local construction cost inflation accelerating even faster than the national average. City of <br />Springfield staff identified this trend in 2005 and subsequently modified their inflationary <br />projection methodology accordingly. <br />In early 2006, the MWMC hired the consulting firm CH2M to perform a comprehensive update <br />of project cost estimates. Following the 2006 update, the RWP’s CIP assumed a general price <br />increase of 5% per-year over the planning period. However, the MWMC continues to monitor <br />inflationary trends to inform our forecasting of capital improvement costs. Accordingly, based on <br />historical inflationary rate trends from 2006 through 2017, capital project budgets now reflect a <br />4% annual inflationary factor in the FY 18-19 Budget and 5-year Capital Plan. <br />Regional Wastewater Capital Program Status and Budget <br />CIP Project Status and Budget <br />The FY 18-19 CIP Budget is comprised of the individual budgets for each of the active <br />(carryover) or starting (new) projects in the first year of the 5-Year Capital Plan. The total of <br />these FY 18-19 project budgets is $31,076,000. Each capital project represented in the FY 18-19 <br />Budget is described in detail in a CIP project sheet that can be found at the end of this document. <br />Each project sheet provides a description of the project, the project’s purpose and driver (the <br />reason for the project), the funding schedule for the project, and the project’s expected final cost <br />and cash flow. For those projects that are in progress, a short status report is included on the <br />project sheet. <br />Page 39FY 18-19 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.