My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
05-14-2018
>
CC Agenda Packet 05-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:02:38 PM
Creation date
5/11/2018 2:01:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />RENEWABLE NATURAL GAS (RNG) UPGRADES <br />Description: <br />This project provides the planning, decision support, and potentially design and <br />construction of Renewable Natural Gas (RNG) Upgrades consisting of biogas <br />purification facilities at the Water Pollution Control Facility (WPCF) and an <br />interconnection with the NW Natural utility grid. Together, these upgrades would allow <br />the MWMC to sell the upgraded gas (RNG) as a transportation fuel through an offtake <br />agreement with Trillium CNG. In addition, Trillium CNG would buy the environmental <br />attributes associated with this renewable fuel. <br />Status: <br />Pre-design <br />Justification: <br /> Full utilization of the MWMC’s biogas at the highest value available for ratepayers. <br />Project Driver: <br />Currently, the WPCF can only utilize approximately 70% of the biogas produced with the <br />remaining 30% being flared as a waste product. <br />Project Trigger: <br />The Commission must make a Go/No Go decision by late summer 2018. If the project is <br />a Go, a final completion date in early 2020 is desired to improve certainty of <br />environmental attribute value, which relies on federal and state governmental programs. <br />Project Type: <br />100% Performance <br />Improvement <br /> SDC Eligibility: <br />0% <br />Estimated Project Cost: <br />$7,520,000 <br />Estimated Cash Flow: <br />FY-17-18 = $470,000; FY 18-19 = $1,325,000; FY 19-20 = $5,725,000 <br />Prior2017-18 <br /> Expenditure/Category:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br /> Design/Construction$0$470,000$7,050,000$0$0$0$0$7,520,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$470,000$7,050,000$0$0$0$0$7,520,000 <br />Page 53FY 18-19 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.