My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
05-14-2018
>
CC Agenda Packet 05-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:02:38 PM
Creation date
5/11/2018 2:01:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />DECOMMISSION WPCF LAGOON <br />Description: <br />This project decommissions the existing biosolids lagoon at the Water Pollution Control <br />Facility (WPCF). <br />Status: <br />As of January 12, 2018: The project is in the design phase. The MWMC hired a <br />consultant in December of 2014 to create a bid package to decommission the lagoon. <br />Lagoon decommissioning onsite work is anticipated by summer of 2019, and the <br />schedule is subject to change based on progress of the construction of the fourth digester <br />improvements. <br />Justification: <br />The lagoon was constructed in 1979 as a temporary biosolids storage facility while the <br />Biosolids Management Facility was under construction. Since that time it has also served <br />as a temporary storage lagoon to support digester cleaning operations. However, the <br />lagoon no longer serves the purpose for which it was originally constructed and does not <br />meet current design standards for wastewater lagoons. <br />Project Driver: <br />The lagoon can no longer provide the biosolids capacity for which it was intended nor <br />cost effectively continue to support digester cleaning operations. The lagoon is almost <br />full of accumulated residual solids. Therefore, the decision was made to decommission <br />the lagoon and change the process of cleaning the digesters. <br />Project Trigger: <br /> The WPCF lagoon no longer functions as originally designed. <br />Estimated Project Cost: <br />$5,800,000 <br />Improvement <br />SDC Eligibility: <br />0% <br />Estimated Cash Flow: <br />FY 13-14 = $1,769; FY 14-15 = $128,550; FY 15-16 = $90,031; FY 16-17 = $18,104; <br />FY 17-18 = $11,546; FY 18-19 = $600,000; FY 19-20 = $4,950,000 <br />Prior2017-18 <br /> Expenditure/Category:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br /> Design/Construction$238,454$11,546$5,550,000$0$0$0$0$5,800,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$238,454$11,546$5,550,000$0$0$0$0$5,800,000 <br />Page 54FY 18-19 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.