Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />ADMINISTRATION/OPERATIONS BUILDING IMPROVEMENTS <br /> Operations Building <br />Description: <br />The project will upgrade the Administration/Operations Building at the Water Pollution <br />Control Facility (WPCF). This project is a follow up to the 2018 construction that is <br />underway to build a new laboratory and expand the existing maintenance building. <br />Status: <br />Due to high construction bids received on March 14, 2017, the MWMC proceeded with a <br />reduced project scope and awarded a construction contract to build a new laboratory and <br />expand the existing maintenance building. Staff is evaluating the next steps to repurpose <br />the Administration/Operations Building. <br />Justification: <br />The original design and construction of the WPCF Administration/Operations Building <br />was completed in the early 1980s. Since that time, use of the building has changed <br />substantially due to modifications in the workforce, advancing technology, regulatory <br />changes, and an increase in staff to support the MWMC mission of cleaning water. <br />Project Driver: <br />The need to update and/or replace the existing Administration/Operations building is <br />driven by the necessity to provide a safe and efficient work environment for the WPCF <br />staff. Many of the planned changes stem from a changing wastewater/environmental <br />business as a result of changing regulations since the WPCF was originally constructed in <br />the early 1980’s. <br />Project Trigger: <br /> Expansion and changes needed for functionality and safety. <br />Estimated Project Cost: <br />$5,000,000 <br />Improvement <br />SDC Eligibility: <br />20.6% <br />Estimated Cash Flow: <br />FY 19-20 = $660,000; FY 20-21 = $1,800,000; FY 21-22 = $2,540,000 <br />Prior2017-18 <br /> Expenditure/Category:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br /> Design/Construction$0$0$0$1,000,000$4,000,000$0$0$5,000,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$0$0$1,000,000$4,000,000$0$0$5,000,000 <br />Page 56FY 18-19 BUDGET AND CIP <br /> <br />