Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />THERMAL LOAD MITIGATION – IMPLEMENTATION 1 <br />Description: <br />This project implements thermal load mitigation projects and may include recycled water <br />use expansion at MWMC facilities, extension of recycled water services to community <br />partners, and other strategies to reduce the MWMC’s liability for thermal load. The <br />recycled water projects may include additional treatment, disinfection, pumping, pipeline, <br />and distribution/irrigation systems. <br />Status: <br />Planning and conceptual design phase for expanded recycled water storage and use at the <br />MWMC’s BMF/BRS/Biocycle Farm facilities as part of the Phase 3 Recycled <br />Water/Thermal Load Mitigation Study, currently underway. <br />Justification: <br /> The Phase 2 Recycled Water/Thermal Load Mitigation Study identified expanded use <br />and storage of recycled water at the MWMC’s Biocycle Farm and adjacent facilities as a <br />multiple-benefit; infrastructure-ready means to reduce thermal load impacts through <br />effluent diversion. Enhanced Biocycle Farm irrigation could increase total harvest yields <br />and market revenues. <br />Project Driver: <br />NPDES permit thermal load limit compliance as required under updated Oregon <br />temperature standards and implementation. Project serves as a complement, or backstop <br />measure, to the Riparian Shade Credits project. <br />Project Trigger: <br />Project implementation as necessary for compliance with Oregon’s temperature standard. <br />Project Type: <br />100% Performance <br />Improvement <br />SDC Eligibility: <br />26.1% <br />Estimated Project Cost: <br />$9,024,594 (planned project budget includes $5,924,594 through FY 22-23 and an <br />additional $3,100,000 beyond FY 22-23 as shown in the estimated cash flow projection <br />below) <br />Estimated Cash Flow: <br />FY 13-14 = $78,925; FY 14-15 = $87,116; FY 15-16 = $111,879; FY 16-17 = $63,682; <br />FY 17-18 = $32,992; FY 18-19 = $0; FY 19-20 = $0; FY 20-21 = $1,850,000; <br />FY 21-22 = $1,900,000, FY 22-23 = $1,800,000; FY 23-24 = $2,000,000; <br />FY 24-25 = $1,100,000 <br />Prior2017-18 <br /> Expenditure/Cateor:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br />gy <br /> Design/Construction$341,602$32,992$0$0$1,850,000$1,900,000$1,800,000$5,924,594 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$341,602$32,992$0$0$1,850,000$1,900,000$1,800,000$5,924,594 <br />Page 55FY 18-19 BUDGET AND CIP <br /> <br />