My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Agenda Packet 05-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
05-14-2018
>
CC Agenda Packet 05-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 2:02:38 PM
Creation date
5/11/2018 2:01:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />RIPARIAN SHADE CREDIT PROGRAM <br />Description:project facilitates the generation of water quality trading credits for temperature <br />This <br />through implementation of riparian shade restoration projects. The primary project <br />elements are the support and funding of the MWMC’s watershed interests through <br />EWEB’s Pure Water Partners program and the ongoing long-term monitoring and <br />reporting associated with the MWMC’s pilot “shade sponsorship” projects that were <br />implemented in 2013-2016 and previously covered under the Thermal Load Mitigation <br />Implementation 1 project sheet on prior year’s budget documents. Prior year’s expenses <br />associated with the MWMC’s pilot “shade sponsorship” projects are not shown here but <br />are shown under the Thermal Load Mitigation Implementation 1 project sheet. <br />Status: <br />On-going <br />Justification: <br /> Sponsorship pilot projects have ongoing contractual obligations through the year 2034 to <br />maintain the site monitoring and reporting required to maintain the MWMC’s regulatory <br />credit. The Pure Water Partners program is the MWMC’s leading and most cost-effective <br />strategy for thermal load compliance. The Pure Water Partners program starts in 2018, <br />including initial outreach to identify qualified project sites to generate shade credits for <br />the MWMC. <br />Project Driver: <br />Ongoing shade contract commitment plus additional NPDES permit compliance needs <br />based on updated temperature standards and thermal load limits. <br />Project Trigger: <br />Impending NPDES permit renewal; currently in administrative extension. <br />Improvement <br /> SDC Eligibility: <br />26.1% <br />Estimated Project Cost: <br />$1,089,000 <br />Estimated Cash Flow: <br />FY 18-19 = $226,000; FY 19-20 = $227,000; FY 20-21 = $212,000; FY 21-22 = $210,000; <br />FY 22-23 = $214,000 <br />Prior2017-18 <br /> Expenditure/Cateor:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br />gy <br /> Design/Construction$0$0$226,000$227,000$212,000$210,000$214,000$1,089,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$0$226,000$227,000$212,000$210,000$214,000$1,089,000 <br />Page 60FY 18-19 BUDGET AND CIP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.