Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />CLASS A DISINFECTION FACILITIES <br />Description: <br />Provides disinfection facilities needed (along with filtration provided by existing <br />facilities) to achieve Class A standards for pilot recycled water uses on non-MWMC <br />sites. Includes the design, construction, and permitting of Class A recycled water <br />disinfection facilities. <br />Status: <br />Conceptual design prepared under the Thermal Load Mitigation Pre-Implementation <br />project. Design/construction ready to proceed in FY18/19. <br />Justification: <br /> Class A recycled water is necessary for pilot use of recycled water on non-MWMC sites. <br />Demonstration of Class A quality and reliability is necessary for stakeholder acceptance <br />and future adoption of expanded recycled water uses. <br />Project Driver: <br />The Phase 2 recycled water implementation/thermal load mitigation study recommended <br />demonstration scale use of Class A recycled water to address stakeholder acceptability <br />issues identified as barriers to full-scale recycled water uses. <br />Project Trigger: <br />Pilot recycled water demonstration sites with willing, ready-to-proceed partners have <br />been identified, including City of Eugene street tree watering and industrial aggregate site <br />equipment washing. <br />Project Type: <br />100% Performance <br />Improvement <br /> SDC Eligibility: <br />26.1% <br />Estimated Project Cost: <br />$750,000 <br />Estimated Cash Flow: <br />FY 18-19: $750,000 <br />Prior2017-18 <br /> Expenditure/Category:YearsEst. Act.2018-192019-202020-212021-222022-23Total <br /> Design/Construction$0$0$750,000$0$0$0$0$750,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$0$750,000$0$0$0$0$750,000 <br />Page 61FY 18-19 BUDGET AND CIP <br /> <br />