Laserfiche WebLink
East Amazon Drive Paving <br />Project Description: This project consisted of rehabilitation of one street in the Southeast <br />Neighbors neighborhood in Council Ward 2: <br />East Amazon Drive from Hilyard Street to Dillard Road <br />· <br />Treatment Methodology: <br />East Amazon Drive was reconstructed using the ICTB process and repaving with 8 inches <br />· <br />of asphalt pavement surface. <br />Costs: Total project costs, from all funding sources, are estimated at $1,765,177. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $1,322,000 <br />$1,545,042 <br />Total Projected/Actual Paving Bond Funds Used = <br />$(223,042) <br />Difference = <br />Additional Sources of Funding: Stormwater and Wastewater utility funds, Stormwater and <br />Transportation system development charges funds, and EWEB funds. <br />Project Photos: <br /> Completed Paving on E. Amazon Drive <br />2017 Report to the SRRP Page 15 <br /> <br />