My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 3-14-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
03-14-2018
>
Agenda Packet 3-14-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:15:10 PM
Creation date
6/4/2018 4:14:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residential (Local) streets will make up 83percent of the total street system backlog in 10 years. <br />To date,residential streets have not been adequately funded for preservation. Between the three <br />bond measures approximately 31 centerline miles have or will receive repair, less than 10 <br />percent of the residential street system. The percentage of streets within the overlay treatment <br />range continues to increase. Looking back, the percentage of residential streets within the no- <br />treatment range has been dropping and is projected to continue so that by 2027,over 57percent <br />of residential streets will require treatment. <br />The primary treatment for residentials to date, 190 lane miles (81centerline miles),hasbeen <br />slurry seals which are included in the no treatment category.Slurry seal treatment may increase <br />the life by five toseven years, and increase the PCI condition. Following this time period these <br />same streets will typically fall into the mid to low end overlay treatement category. <br />18 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.