My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 4-16-18 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
04-16-2018
>
Agenda Packet 4-16-18 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:21:38 PM
Creation date
6/4/2018 4:21:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Amazon Drive Paving <br />Project Description: This project consisted of rehabilitation of one street in the Southeast <br />Neighbors neighborhood in Council Ward 2: <br />East Amazon Drive from Hilyard Street to Dillard Road <br />· <br />Treatment Methodology: <br />East Amazon Drive was reconstructed using the ICTB process and repaving with 8 inches <br />· <br />of asphalt pavement surface. <br />Costs: Total project costs, from all funding sources, are estimated at $1,765,177. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $1,322,000 <br />$1,545,042 <br />Total Projected/Actual Paving Bond Funds Used = <br />$(223,042) <br />Difference = <br />Additional Sources of Funding: Stormwater and Wastewater utility funds, Stormwater and <br />Transportation system development charges funds, and EWEB funds. <br />Project Photos: <br /> Completed Paving on E. Amazon Drive <br />2017 Report to the SRRP Page 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.