My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 4-16-18 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
04-16-2018
>
Agenda Packet 4-16-18 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 4:21:38 PM
Creation date
6/4/2018 4:21:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jefferson Street Paving <br />Project Description: This project reconstructed one street in the Jefferson Westside Neighbors <br />neighborhood in Council Ward 1: <br />thth <br />Jefferson Street from 8 Avenue to 18 Avenue <br />· <br />Treatment Methodology: Jefferson Street was reconstructed using 9 and 10 thick reinforced <br />Portland cement concrete. <br />Costs: Total project costs, from all funding sources, are estimated at $3,022,425. <br />Preliminary Estimate based on Pavement <br />Management System (PMS) Surface Evaluation = $1,237,000 <br />$2,586,800 <br />Total Projected/Actual Paving Bond Funds Used = <br />$(1,349,800) <br />Difference = <br />The programmed budget for the project was not sufficient to cover the scope and scale of the <br />full reconstruction of the concrete street, causing a large budget overrun. <br />Additional Sources of Funding: Stormwater and Wastewater utility funds, Stormwater SDC <br />funds, and EWEB funds. <br />Bicycling and Pedestrian Improvement funds were used for signage at three enhanced pedestrian <br />crossings. <br />Project Photos: <br /> Completed Paving on Jefferson St. Completed Paving on Jefferson St. <br />2017 Report to the SRRP Page 16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.