My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5247
COE
>
City of Eugene
>
Resolutions
>
2018 No. 5215-5257
>
Resolution No. 5247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 4:37:40 PM
Creation date
10/19/2018 4:37:17 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
10/17/2018
Document_Number
Resolution No. 5247
CMO_Effective_Date
10/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirement and exceed the 10% energy efficiency benchmark. Gordon Lofts <br />will be required to submit an energy model with their permit application and <br />a commissioning report due 18 months after certificate of occupancy is issued. <br />As the project does not include onsite parking, the project will not include <br />installation of conduit for future electric vehicle charging stations. <br />2.6.3 Local Economic Impact Plan. A plan is in place for more than 50% of the <br />project's dollar volume of professional services and construction contracts to <br />be local to Lane County (estimated at 71%). The applicant is committed to <br />promoting open competitive opportunities for Minority, Women, and <br />Emerging Small Businesses, and is committed to complying with wage, tax, and <br />licensing laws. <br />2.6.4 Moderate -Income Housing Contribution. The project will pay a fee to be <br />dedicated to moderate -income housing. The fee will be 10% of the total <br />exemption benefit for the 10 -year benefit. <br />2.6.5 Project Design and Compatibility. The project will address basic design <br />concepts in the context of the project location and will be designed and <br />permitted for construction as shown in the resolution (should City Council <br />approve the MUPTE). The building is constructed as one component of a <br />larger development with a mix of uses. It is 7 stories, with a relatively narrow <br />street frontage on Pearl Street. The ground floor is retail and commercial <br />space with upper levels of residential. The design elements include a tall first <br />floor with a row of urban storefronts facing south on to the proposed Market <br />Alley and a residential entrance with a lobby facing east on to Pearl Street. <br />Upper levels are regular bays of openings grouped vertically and punctuated <br />by balconies. The building has a roof deck above the sixth floor, and the <br />residential units are characterized by large windows. Building materials are <br />primarily brick and stucco, with metal and glass storefronts and metal <br />balconies. The building meets City requirements for vehicle parking (no <br />minimum) and bicycle parking, and will utilize existing lots owned or under <br />contract by the developer for additional parking need. The basic design <br />concepts include the scale, form, and quality of the building; the mix of <br />project elements; the relationship to the street and surrounding uses; and <br />parking and circulation. <br />The project design is designed to contribute to its downtown Eugene <br />context. The development is designed for the human scale, will add a needed <br />mix of uses, promote active transportation modes, support a more vibrant <br />pedestrian realm, and increase safety through additional activity and "eyes on <br />the street." <br />2.6.6 Historic and Existing Housing Sensitivity. The project is adjacent to three <br />properties with the historic locale definition, but they are not affected by the <br />Gordon Lofts redevelopment. The project includes no direct, structural <br />Page 2 of 4 <br />Resolution EXHIBIT A - Report and Recommendation <br />
The URL can be used to link to this page
Your browser does not support the video tag.