Laserfiche WebLink
impacts, such as alterations or demolitions, to any of the identified resources. <br />Furthermore, each locale will maintain its setting and special relationships <br />that characterize each property." No historic structures or existing housing <br />were demolished or removed from the property in the 2 years prior to the date <br />of application. <br />2.6.7 Project Need. The project's pro -forma and financial information was analyzed <br />by PNW Economics, an independent, real estate economics consultant who <br />found that the project as proposed could not be built but for the benefit of the <br />tax exemption. The financial information Gordon Lofts submitted in their <br />application is based on projections prior to finalizing financing, construction, <br />and tenanting. It includes assumptions regarding rents, vacancy rates, <br />operating costs, lender underwriting criteria, interest rates, and reasonable <br />rate of return. PNW Economics, the Review Panel, and staff reviewed the <br />assumptions. The PNW Economics analysis concludes that the project would <br />not be viable without the availability of the MUPTE, using the reasonable <br />assumptions outlined and concludes that MUPTE is critical to the success of <br />the project from a financial feasibility perspective. See Section 4 below for the <br />Review Panel's conclusions. <br />2.6.8 Public Benefit beyond Period of Exemption. The public benefits of the project that <br />will extend beyond the period of the tax exemption include Green Building (energy <br />performance), Project Design and Compatibility, and Compact Urban <br />Development. <br />2.7 A presentation on the Gordon Lofts project was given to the Downtown Neighborhood <br />Association on March 28, 2018. <br />2.7.1 Future Neighborhood Engagement. Prior to completing final drawings, <br />Gordon Lofts will meet with the Downtown Neighborhood Association. Before <br />submitting for permits, Gordon Lofts will submit the design to staff to review <br />conformance with the design attached to the MUPTE resolution (should City <br />Council approve the MUPTE). Staff will also allow the neighborhood an <br />opportunity to review and comment on that final design. <br />3. A display ad soliciting recommendations or comments from the public regarding this project <br />was published in the Register -Guard on July 14, 2018. The period for comment expired on <br />August 13, 2018 and resulted in 26 written comments. Additional comments were submitted <br />to staff or directly to City Council after the official comment period. All 26 comments received <br />as of October 8 were provided to City Council with the materials for the October 17 work <br />session. <br />4. The community member MUPTE Review Panel considered the project application, including <br />compliance with program criteria and the independent consultant's financial review, during 3 <br />meetings held on August 23, September 10, and September 20. The Review Panel concluded <br />that the project meets the Required Public Benefit criteria. The Panel noted that Project Need <br />Page 3 of 4 <br />Resolution EXHIBIT A - Report and Recommendation <br />