My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5254
COE
>
City of Eugene
>
Resolutions
>
2018 No. 5215-5257
>
Resolution No. 5254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 3:13:10 PM
Creation date
11/30/2018 3:12:05 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/26/2018
Document_Number
Resolution No. 5254
CMO_Effective_Date
1/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reimbursement fees must be established or modified by ordinance or resolution setting <br />forth a methodology that is, when applicable, based on: <br />(A) Ratemaking principles employed to finance publicly owned capital <br />improvements; <br />(B) Prior contributions by existing users; <br />(C) Gifts or grants from federal or state government or private persons; <br />(D) The value of unused capacity available to future users or the cost of the existing <br />facilities; and <br />(E) Other relevant factors identified by the local government imposing the fee. <br />The methodology for establishing or modifying a reimbursement fee must promote the <br />objective of future system users contributing no more than an equitable share to the cost <br />of existing facilities and it must be available for public inspection. <br />Improvement fees must be established or modified by ordinance or resolution setting <br />forth a methodology that is available for pubic inspection and demonstrates <br />consideration of: <br />(A) The projected cost of the capital improvements identified in the plan and list <br />adopted pursuant to ORS 223.309 that are needed to increase the capacity of <br />the systems to which the fee is related; and <br />(B) The need for increased capacity in the system to which the fee is related that <br />will be required to serve the demands placed on the system by future users. <br />• Credits are required for "qualified public improvements." <br />This general approach is illustrated in Figure G-1 and can be outlined in the following steps: <br />• Determine System Service Characteristics. <br />➢ System consists of several components (e.g., lines, pump stations, force mains, and <br />manholes are components of the wastewater system). <br />➢ Establish impact measure - that feature of development that best reflects use of <br />system capacity (e.g., trips for the transportation system, impervious surface for the <br />stormwater system, etc.). <br />Determine System Value, including associated costs such as design, construction, right- <br />of-way acquisition and project administration. <br />➢ Use replacement cost (current construction costs). <br />➢ Determine capacity -oriented cost of system, net of assessments and grants. <br />➢ Determine portion of system value attributable to servicing the needs of future <br />development. <br />• Allocate the system value to the unit of impact (e.g., cost per unit of impervious area for <br />stormwater system). <br />• Determine the service impact of specific development types (e.g., single-family dwelling, <br />City of Eugene SDC Methodologies - General Methodology Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.