My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5254
COE
>
City of Eugene
>
Resolutions
>
2018 No. 5215-5257
>
Resolution No. 5254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 3:13:10 PM
Creation date
11/30/2018 3:12:05 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/26/2018
Document_Number
Resolution No. 5254
CMO_Effective_Date
1/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
found in Table 9 and the fee schedule in Appendix F. <br />Where the stormwater SDC is a fixed amount per dwelling unit or space, it shall be determined by <br />multiplying the applicable rate per dwelling unit or space times the number of units or spaces plus, for <br />manufactured home park development, the SDC is based upon the impervious surface area of all <br />additional common areas times the applicable stormwater unit cost per square foot of impervious <br />surface area. Where the stormwater SDC is not a fixed amount per dwelling unit or space, it shall be <br />determined by multiplying the applicable rate per square foot of impervious surface area times the total <br />impervious surface area of the proposed development. Where a development creates impact not <br />attributable to impervious surface area, the stormwater SDC shall be determined by evaluating <br />equivalent impervious surface area, multiplied by the applicable rate per square foot of impervious <br />surface area. <br />6.0 Parks System <br />The parks SDC is based upon the estimated cost of capacity in future capacity -enhancing projects to <br />serve new development, as contained in the Parks, Recreation and Open Space (PROS) Project & <br />Priority Plan, and the estimated capacity in the existing parks system to be used by new development. <br />The details for calculating the park SDC unit costs (rates) for residential development (per dwelling unit <br />type) and nonresidential development (per room or per thousand gross square feet) are set forth in <br />Appendix E. The park SDC is determined by multiplying the applicable rate by the unit of measure for <br />the proposed development type. The costs per unit of measure and resulting rates may be found in <br />Table 17. <br />7.0 Impact Reductions, Credits, and Compact Development Adjustments <br />This section provides detail on the City's administration of SDC impact reductions, credits, and <br />compact development adjustments. Potential sources, criteria for eligibility, and the basis for <br />calculation of impact reductions, credits, and compact development adjustments are defined in this <br />Methodology (including appendices) and in Eugene Code, 1971 sections 7.730 and 7.732. A list of <br />examples of facilities and programs which are potentially eligible for these adjustments appears in <br />Table G-1 of this section. (Note: As development standards change, some examples may no longer <br />be considered eligible for reduction, but may influence future rates.) In no case may the sum of all <br />approved credits, impact reductions, and compact development adjustments for a single system <br />exceed the amount of the SDC assessed for that system for any approved building or development <br />permit. <br />The amount owed for SDCs may be reduced by one or more of the following processes described in <br />this methodology: <br />Impact Reduction, based on quantified mitigation of demand generated by the development for <br />new identifiable capital improvements (available for transportation and stormwater system <br />SDCs); <br />Credit, based on the specific costs for privately engineered construction of certain public <br />improvements as part of the development; <br />• Credit, based upon the payment of or contribution to the cost of certain capital improvements in <br />association with multiple -family residential projects of five dwelling units or more (available for <br />transportation, wastewater, stormwater, and parks system SDCs); <br />City of Eugene SDC Methodologies - General Methodology <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.