My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5254
COE
>
City of Eugene
>
Resolutions
>
2018 No. 5215-5257
>
Resolution No. 5254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 3:13:10 PM
Creation date
11/30/2018 3:12:05 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
11/26/2018
Document_Number
Resolution No. 5254
CMO_Effective_Date
1/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Credit based on previous payment or use (available for transportation, wastewater, stormwater, <br />and parks system SDCs); <br />• Compact Development Adjustments (available for transportation system SDCs) <br />Adjustment of SDCs due to impact reductions, credits, and compact development adjustments: <br />• Shall not be given for improvements constructed or programs instituted prior to City approval. <br />• Shall be applied up to the maximum SDC fee for the applicable system. <br />• Shall reduce the SDCs paid on building permits at the time of issuance, but in no case may the <br />sum of impact reductions, credits, and compact development adjustments exceed the SDC. <br />• Shall be applied to a particular system (e.g., Transportation, Stormwater, Wastewater, Parks); <br />credits or reductions approved for a particular system cannot be transferred or applied to any <br />other system charges. <br />• Shall be applied to the SDCs for the particular development, may only be further applied to <br />subsequent phases of the same development for which the improvement was constructed or <br />program instituted, and cannot be transferred or applied to other properties or developments. <br />7.1 Impact Reductions or Mitigation <br />City approval of an impact reduction or mitigation will be based on programs instituted in connection <br />with development and/or private physical improvements (as defined in Appendix A) constructed as part <br />of the development. Such programs and improvements shall: <br />• Reduce the demand from that development for future construction of identifiable capital <br />improvements; <br />• Be privately financed; and <br />• Be designed to be permanent. <br />The anticipated reduction in demand must be demonstrated to the satisfaction of the City Engineer. <br />Calculation of impact reduction shall be based on the ratio of the system impact with the program or <br />facility in place, to the system impact if the program or facility did not exist. <br />Prior to application of the impact reduction to the SDCs for the development, the City shall receive <br />assurances that will bind the developer, owner, and the owner's successors as is necessary to ensure <br />that the program or facility will function as planned for the agreed upon time period. Such agreements <br />may include, but are not limited to performance bonds, maintenance programs, annual reports, <br />monitoring and inspections, or other pertinent items to document proper functioning as determined by <br />the City Engineer. <br />7.1.1 Transportation System Impact Reduction <br />For the transportation system, an impact reduction may be granted if the applicant <br />demonstrates to the satisfaction of the City Engineer, that the improvement or program to be <br />instituted in connection with the development will materially reduce the number of automobile <br />City of Eugene SDC Methodologies - General Methodology <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.