Laserfiche WebLink
6 <br /> <br />Figure 4: Average Rating of Corridor Alternatives from Open House and Online Respondents <br /> <br />Highway 99: There is strong support for the build alternatives, with the Enhanced Corridor Alternative <br />rated most favorable. The rating for No-Build was the second lowest for all the corridors. <br />River Road: River Road is the only corridor with EmX rated as the most preferred options. In addition, <br />the No-Build Alternatives was the lowest rated among all the corridors. <br />30th Avenue to LCC: This corridor had the greatest balance between the three alternatives, with <br />Enhanced Corridor rated singly better than EmX. The No-Build Alternative is rated relatively high <br />compared to the other corridors. <br />Coburg Road: The Enhanced Corridor Alternative was the highest rated option for Coburg Road, <br />although both build alternatives were generally rated lower than on other corridors. <br />MLK, Jr. Boulevard: The Enhanced Corridor Alternative was rated more highly than the No-Build <br />Alternative (this corridor does not have an EmX alternative). There is a possibility that the City of Eugene <br />will proceed with the installation of Business Access Transit (BAT) lanes on MLK, Jr. Boulevard, which is a <br />key element of the planned Enhanced Corridor Transit improvements. Additional improvements as part <br />of the Enhanced Corridor Alternative could be minimal. <br />Investment Packages <br />Of the five proposed Investment Packages, two packages – an all Enhanced Corridor package and an all <br />EmX package (except MLK, which doesn’t have an EmX option) – are intended to provide low and high <br />investment options. These two packages “bookend” three other alternatives, designated as Packages A, <br />B, and C, which are a combination of No-Build, Enhanced Corridor, and EmX alternatives. The proposed <br />investment packages are shown in Table 2. <br />0.00 <br />0.50 <br />1.00 <br />1.50 <br />2.00 <br />2.50 <br />3.00 <br />3.50 <br />4.00 <br />Highway 99 River Road 30th/LCC Coburg Road MLK, Jr. Boulevard <br />Corridor Alternative Ratings <br />Combined Online and Open House Participants <br />No-Build Enhanced Corridor EmX <br />February 19, 2019, Work Session - Item 1