Laserfiche WebLink
12 <br /> <br />PACKAGE B <br /> Package B <br />Corridor No-Build <br />Enhanced <br />Corridor EmX <br />Highway 99  <br />River Road  <br />30th Ave to LCC  <br />Coburg Road  <br />MLK, Jr. Boulevard  <br /> <br /> <br /> <br />Package B provides for a moderate level of investment, with build options on four of the five corridors. <br />The only EmX Alternative is on the River Road Corridor. All corridors use the preferred option based on <br />community feedback, except the 30th Avenue to LCC corridor. This package provides moderate ratings <br />on most criteria. The package rates well on investments focused in corridors with higher levels of low- <br />income and minority populations, and has an average level of public support. This package is moderately <br />Average <br />Bicycle/Pedestrian Access and Safety <br />Investments (1-5 rating)3.1 <br />Capital Cost (millions) <br />Consistency with Local Plans and Policies 3.2 <br />Investment in Corridors with Higher Level of <br />Disadvantaged Population <br />Number/Acreage of Acquisitions 137 /4.6 44 /1.3 40 /2.2 0 /0 47 /1 6 /0.1 <br />Operating Cost Change from No-Build <br />(annual, in millions) <br />Parking Impacts: Corridor On-Street and Off- <br />Street Parking Impacts (number of spaces) <br />Potential Property Displacements <br />Ridership Increase Compared to No-Build <br />(annual) <br />Support for Corridor Development and <br />Redevelopment (1-5 rating)3.0 <br />Support from the Public (1-5 rating)3.45 <br />Transit Travel Time Improvement (percent)22% <br />Tree Impacts: Number of Medium and Large <br />Trees Impacted <br />Enhanced <br />Corridor <br />0 <br />2.5 <br />$21 <br />$1.1 <br />0 <br />164 <br />3.69 3.73 2.65 3.45 <br />34%31%0%28% <br />14 132 0 9 <br />576,000 186,000 <br />76% <br />4 5 1 3 <br />4 5 1 3 <br />$181 $38 $78 $0 $41 <br />Total <br />Enhanced <br />Corridor EmX No-Build <br />Enhanced <br />Corridor <br />6 0 6 0 0 <br />Package Summary <br />Package B Evaluation Summary <br />Highway 99 River Road <br />30th Avenue <br />to LCC Coburg Road <br />MLK, Jr. <br />Parkway <br />3 <br />Measure <br />$3.0 ($0.1)$2.0 $0.0 $0.0 <br />148 50 31 0 67 <br />111,000 246,000 0 63,000 <br />3 5 1 3 3 <br />3.71 <br />15% <br />9 <br />February 19, 2019, Work Session - Item 1