My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 2-19-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
02-19-19
>
Agenda Packet 2-19-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:07:03 PM
Creation date
2/8/2019 4:56:57 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
2/19/2019
City_Council_Effective_Date
2/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> <br />PACKAGE C <br /> Package C <br />Corridor No-Build <br />Enhanced <br />Corridor EmX <br />Highway 99 <br />River Road <br />30th Ave to LCC <br />Coburg Road <br />MLK, Jr. Boulevard <br /> <br /> <br /> <br />Package C represents a relatively high level of investment, with build alternatives on all five corridors. In <br />this package, the preferred mode alternative, as determined through community feedback, has been <br />selected for each of the five corridors. This package is rated higher than the other packages except the <br />EmX Package for consistency with local plans and policies, showing slight decreases in energy <br />consumption and greenhouse gas emissions, and significant safety improvements. <br />Average <br />Bicycle/Pedestrian Access and Safety <br />Investments (1-5 rating)3.5 <br />Capital Cost (millions) <br />Consistency with Local Plans and Policies 3.4 <br />Investment in Corridors with Higher Level of <br />Disadvantaged Population <br />Number/Acreage of Acquisitions 150 /5.0 44 /1.3 40 /2.2 13 /0.4 47 /1 6 /0.1 <br />Operating Cost Change from No-Build <br />(annual, in millions) <br />Parking Impacts: Corridor On-Street and Off- <br />Street Parking Impacts (number of spaces) <br />Potential Property Displacements <br />Ridership Increase Compared to No-Build <br />(annual) <br />Support for Corridor Development and <br />Redevelopment (1-5 rating)3.4 <br />Support from the Public (1-5 rating)3.61 <br />Transit Travel Time Improvement (percent)23% <br />Tree Impacts: Number of Medium and Large <br />Trees Impacted <br />3 <br />3.69 3.73 3.47 3.45 3.71 <br />34%31%6%28%15% <br />14 132 58 9 9 <br />$41 $21 <br />50 31 69 67 0 <br />($0.1)$2.0 ($0.5)$0.0 $1.1 <br />0 6 0 0 0 <br />222 <br />Measure <br />Package Summary <br />Total <br />6 <br />$202 <br />68% <br />$2.5 <br />217 <br />4 5 3 3 2.5 <br />$38 $78 $21 <br />Highway 99 River Road <br />30th Avenue <br />to LCC Coburg Road <br />MLK, Jr. <br />Parkway <br />Enhanced <br />Corridor EmX <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />4 5 2 3 3 <br />521,000 111,000 246,000 (30,000)63,000 186,000 <br />3 5 3 3 <br />Package C Evaluation Summary <br />February 19, 2019, Work Session - Item 1
The URL can be used to link to this page
Your browser does not support the video tag.