My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~EST EU~NE PARKWAY ~tOO{F~ED PROJECT--CONSISTENCY W{~ THE STATEW1D~ ~NNING ~ AND TRANSPORTATION PLANNING RULE <br /> <br />amendment to modify the facility's location, given that this amendment does not change those <br />provisions~ While the answer may well be "no?0 these provisions of the rule nevertheless are <br />addressed herein in an exercise of caution. However, to the extent this analysis is unnecessary and <br />thus would constitute %urplussage,' it should be considered as such. <br /> <br />Clearly, the TPR exceptions provisions applicable to the location of the facility apply because the <br />Modified Project ~nvolves a location outside of the corridor approved in the 1986 exception. Pursuant <br />to those requirements, exceptions are addressed herein for Goals 3 (Agricultural Lands)~ 4 (Forest <br />Lands) 11 (Public Facilities and Services) and 14 (Urbanization} for that portion of the Modified <br />Project to be located outside the UGB. While most of the affected rural land is agricultural, a very <br />small portion ekher directly or indirectly affected is designated by Lane County as Forest Land. See <br />Land Use Technica; Re~ort, Figure 7; ~gDE[& Figure 3-4~ Accordingly~ Goal 4 must be addressed. <br /> <br />Scope of Analysis and Applicable Statewide Planning Goal <br />Standards <br /> <br />As stated above, the WEP ha~s been included in the acknowledged Lane County Rura; Comj)rehensive <br />?;an and the ~T(etro ?;an for many years. It is authorized in the Tram~?;an. Because the WEP is <br />acknowledged~ it should not be necessary for the City or County to readdress goal compliance ~br the <br />project in its entirety. However, goal compliance must be demonstrated for those changes requirk~g <br />amendments to the acknowledged plans. <br /> <br />This analysis addresses goal compliance issues arising from the shif~ in the alignment from the <br />Approved Design to the Modified Project in "Unit 2" of the project~ Lc. that portion of the WEP <br />located between Beltl~ne Highway and the western terminus of the projec[ See SDE/r$, Figure 2~2. <br />This is the portion of the project ~at requires goal exceptions and analysis of alternatives under the <br />TPR. Alignment modifications occurring in Unit I of the project generally are beyond the scope of <br />th~s analysis~ <br /> <br />The land use standards applicable to the Modified Project include the statewide planning goals and <br />OAR 660~012-0060~ 6~0-012-0065~ and 6~0-012-0070. Because goal exceptions take the form of <br />plan amendments~ the Modified Project also must be shown to comply with relevant unamended <br />provisions of the acknowledged Lane County and City of Eugene comprehensive plans. Further~ the <br />project must comply with the ODOT's Oregon H~ghway Plan. <br /> <br />This technical memorandum addresses only the Modified Project's compliance wkh the identified <br />TPR requirements and statewide planning goals. Compliance wkh the Oregon Highway Plan and <br />applicable comprehensive plans policies is discussed at pages 58-105 of the Land Use Technical <br />Report. 1 ~ <br /> <br />C m <br /> omphance with the Statewide Planning Goals <br />This section addresses compliance with Statewide Planning Goals I-14. Because the Modified Project <br />does not affect the Willamette RNer Greenway or coastal resources, Goals 15 through 19 do not <br />apply. <br /> <br />10 This ~ a ~ga~ question to be addressed by the Department of Justice. <br />11 The La~e CouRcJI of Governments (LCOG), La~e County and the c~ies of Eugene and Springfield are in the process of <br />preparing regional and ~°c~ ~ra~sportation system P~ans ~SPs) as required by the Transportation P~anning Rule. The p{an <br />amendments addressed ~n this document w{ll be adopted separately from the TSP adoption process. <br /> <br />EXHIBIT C-I - FINDINGS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.