My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEST ELIC~NE PAP, KWAY M(X~FI~ PROJECT-.CONSiSTENCY ~TH T~ STATEtP~IDE ~NNING GOALS A~D TRANSPE~An~ PLANN~ Rd <br /> <br />Traffic management measures; and <br /> <br />Improvements to existing transportation facilities." <br /> <br />Transportation Need <br />Re identified transportation need is for the West Eugene Parkway P_~i~9_~t rather than the Modified <br />Proj~t ~ The need ~br the Modified Project alignment is e~.~¢yimnme.__.., n.~J, to reduce <br />significant adverse impacts to high value wetlands and to threatened and endangered plant and animal <br />species from those that would occur through construction of the Approved Desigm As described in <br />the Alternatives Memorandum, the Modified Project will impact 6.4 hectares of high value wetlands, <br />compared to 11.27 for the Approved Design? It also directly impacts only three clumps of <br />endangered plants, compared to 39 plants or plant clumps for the Approved Design, and unlike the <br />Approved Design~ k d~s not eliminate western pond turtle habitat. The Modified Project also <br />includes five undercross~ngs between Terpy Street and its western terminus to provide safe crossings <br />for small animals including the western pond turtle.34 <br /> <br />Because the West Eugene Parkway project already is an element of the acknowledged Metro Plan, <br />TransPtan, and Lane County Rural Compreher~ive Plan, a statement of reasons why there is a <br />transportation need for the WEP should not ~ necessary. The overall need for the project is not <br />affected by the alignment modification from the Approved Desi~ to the Modified Project. <br />Nonetheless, ~is is addressed in an exercise of caution. To the extent this constitutes surplussage, it <br />should be regarded as such. <br /> <br />Ink[ally, the 1986 exception ~dentified a need to provide a safe transition to Highway 126 and avoid <br />the narrow, curved ore,ass w~th the railroad. That transportation need still exists~ as do the needs, <br />identified in the t985 Draft Environmental Impact Statement and repeated in the SD~g& to (1) <br />improve access to the West Eugene industrial area v~a direct connections w~th only strategic <br />crossroads, (2) better link West Eugene residential areas with downtown, (3) relieve congestion and <br />improve safety along West ] lth Avenue by removing most ~ntra- and ~nter-regional and some local <br />traffic from the busiest and most h~dous section of West 1 lth Avenue, (4) facilitate intra- and <br />~nter-regional ~d citywide ~'avel through the western half of the C~ty of Eugene between H~ghway <br />126 ~d the Interstate 5~nterstate 105 corridor, and (5) ~mplement an important part of the areawide <br />roadway system as envisioned [n the TransPhn. See SDEI$ at I- 1; see also 5;upp~emental Needs <br />Analysis and Alternatives Memorandum. <br /> <br />The Transportation Planning Rule, at OAR 660-012-0005(28), defines "regional transportation <br />needs" as "needs for movement of people and goods between and through communkies and <br />accessibility to regional destinations wi~in a metropolitan area, county or associated group of <br />counties." ~ose needs exist in West Eugene, as identified above. The West Eugene Parkway, with <br />the Modified Project alignment~ would serve regional transportation needs of the area by enhancing <br />the movement of traffic through the Eugene-Springfield region, by improving access to regional <br />population and emplo3ment centers (in particular, the West Eugene industrial area and the Willow <br />Creek Basin35), and by ~mproving accessibility to regional destinations, including Fern Ridge <br /> <br />33 A~temativos Memorandum, Tabie 4. <br />34 SDE~$ at 2-~ % <br />35 The ~ Creek Basin ~ ~ south of West ~ ~ Aven~e ~n Wes~ Euge~. The ~982 ~ Cr~k Spe~al Ama S~udy <br /> <br />9~ emp!oYees~ The p~a~ a~ mSu~ed ~n ~he designation of another ~,622 e~s as ~u~an rese~e~ ~and. S~ Supplemen~ <br />the 205-a~e ~11~ Creek ~ndUstdal pa~. <br /> <br />EXHIB~ C4 - FiNDiNGS 22 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.