Laserfiche WebLink
EXHIBIT C~2 <br /> <br />TECHNICAL MEMORANDUM <br /> <br />CH2~HILL <br /> <br />Alternatives Considered- WEP <br /> <br />PREPARED FOR: Jim Co>dODOT <br />PREPARED BY: Jay McRae, PE/CH2M HILL <br />coP~ES: Mark Greenfield/GA <br /> Amy Hopper/CH2M HILL <br />DATE: October 4, 1999 <br /> <br />Purpose of Memo <br /> <br />The development of the West Eugene Parkway Project from West 11th Avenue easterly to Garfield <br />along Highway t 26 has spanned over three decades. Numerous alternatives have been considered <br />and many have been rejected for a variety of reasons - engineering infeasibilky, inconsistency with <br />loc~l plan, adverse impacts to natural msoumes, and unreasonable socio-economic impacts - to arrive <br />at a build alternative that best satisfies the purpose and need for the project. <br /> <br />The Modified Project (Northern Alternative) is the recommended WEP alternative. The alignment <br />includes a section that would extend part of the facility a short distance onto agricultural land west of <br />the Eugene-Springfield Metro area Urban Growth Boundary (UGB)~ The Transportation Planning <br />Rule (TPR) governs transportation facilities and improvements located outside the UGB specifying <br />which facilities are appropriate in rural locations. Any' facilkies which are not specified in the TPR <br />require goal exceptions to locate on rural lands. The exception statement required by the TPR must <br />address the identified transportation need and explain why that need cannot reasonably be <br />accommodated through alternative modes~ or by locations not requiring an exceptiom The TPR also <br />requires the ~dentificafion and justification of the factors used to determine why alternatives not <br />requiring goal exceptions cannot reasonably accommodate the nee& Under the TPR the <br />recommended WEP alternative would require exceptions to Goals 3~ 4~ 11 and <br /> <br />This memo is not an exception statement, the purpose is to provide a record of background <br />~nformation and facts regarding the alternatives considered for the West Eugene Parkway <br />Specifically, why those alternatives cannot accommodate the project need. The basis of this paper is <br />the Draf~ SEIS with additional research and information added as necessary. This document <br />considers the following topics: <br /> <br />Background <br /> <br />Purpose and Need - description of basic premise of the project <br />Project History - discussion includes general evolution of the project to date and planning <br />context <br />Decision Criteria - constraints~ goals, and objectives <br /> <br />~ro~ect Context <br /> <br /> System Assumptions - fundamental assumptions related to the transportation system <br /> <br />EXHIBff C-2 - FiNDiNGS <br /> <br /> <br />