My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTERNATIVES CONSI~REED- WEP <br /> <br />The model runs used in 1996 to conduct the transportation operational analysis shown in Appendix B <br />include TDM Programs. Revisions to the model associated with proposed expansion of TDM <br />Programs from 1996 levels are not considered to be detectable within the precision and accuracy of <br />the model according to Bud Reiffs, LCOG's principle modeler. It is clear that TDM provides a <br />benefit to the overall transportation system and improve overall operations. The marginal <br />improvement is not significant enough to negate the need for the WEP. <br /> <br />Pub)lc Transit <br />In August of 1997, LCOG conducted an analysis on the potential for Public Transportation in <br />Eugene-Springfield Area. This study consisted of a market analysis, system analysis, and findings <br />and conclusions. The following paragraphs address the public transit findings and direction being <br />established for future system development. <br /> <br />Due to growth in the area and increasing demand for faster, more convenient transit service, Lane <br />Transit District (LTD) has proposed development of Bus a Rapid Transit system (BRT). The BRT <br />system is based on light-rail transit principles, but instead of the required capital investment in trains <br />and track, it utilizes buses in service that is integrated with key components of the existing <br />automobile transportation infrastructure, such as roads and rights-of-way, intersections, and traffic <br />signals. <br /> <br />The BRT system would be used as a complementary element to regular Public Transit service. The <br />West 1 Ith/West 18th Avenues (Eugene) - Main Street (Springfield). as identified in Draft Revised <br />TransPlan. Service frequencies would be similar to regular services with 1 O-minute headways, <br />weekday daytime and 20-minute headways, evenings and weekends. Regular service would default <br />to 20-minute headways off-peak. BRT would employ several features to decrease travel times <br />including; exclusive bus lanes, transit priority treatments (e.g. preferential traffic signal timing and <br />queue-jumpers), extended stop spacing, enhanced shelters and boarding areas, and barrier free fare <br />system. <br /> <br />Findings from the analysis conclude that BRT and mixed-use nodal development patterns are <br />complementary strategies~ The actual analysis was conducted in coordination with TDM strategies, <br />land use measures, and transportation system improvements. The analysis strategies included <br />existing conditions, base case, TDM emphasis, land use emphasis, system changes emphasis, and <br />equal emphasis. The range of pement transit modal share excluding external trips ranged from a low <br />of 2A0% for 1995 conditions, 2.23% for 2015 base case, up to the highest with 4.03% with 2015 <br />equal emphasis. The cost to implement BRT ranges from a low end of $27 million to a high end of <br />$102 million depending upon the degree to which a pure BRT system can be implemented. There <br />will be tradeoffs made between BRT and a comparable fixed route system. The Draft Revised <br />TraasPIan proposes to implement a variation of the equal emphasis scenario. <br /> <br />It is clear from the numbers generated from these studies that increases in investment in Public <br />Transportation and changes in land use will have an affect on improving transportation operations. <br />The marginal improvement is not significant enough to negate the need for the WEP. <br /> <br /> System Improvements - The proposed system improvements are likely to be revised prior to <br /> approval of TransPIam The Draft Revised TransPlan proposes the following improvements to east- <br /> west facilities in the West Eugene Vicinity: <br /> <br /> * Improve Royal Avenue from Green Hill Road to Terry Street to urban standards. <br /> Improve Roosevelt Blvd. from Danebo to Beltline to urban standards as part of the Beltline <br /> Project from Royal Avenue to Central Oregon and Pacific Railroad. <br /> <br />EXHIBIT C-2 - F~NDtNGS Il <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.