My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AL~RNAT~V~S CONSID~R~D ~ WEP <br /> <br />Plans include nodal development areas including commercial, employment, or neighborhood <br />centers as well as future capacity improvements from the UGB to Danebo along West 11th <br />Avenue. This route has been identified as a "pilot test case ' as a bus rapid transit corridor. <br />West 18th Avenue has been identified as a study route due to the apparent conflict between <br />function and adjacent uses. Traffic volumes are higher than desirable for the adjacent land uses. <br />Implement Unit lA of the West Eugene Parkway. <br /> <br />Base Case and Existing Conditions <br />The purpose of this section is to highlight existing characteristics of the east-west arterial system in <br />West Eugene. The following discussion includes a description of general setting, physical facilities, <br />and statement of the out of direction travel required for east,-west through trips as an alternative to <br />the WEP. <br /> <br />Royi~l Avenue - Royal Avenue is north of West 11 th Avenue approximately 1.4 miles and functions <br />as an east-west minor arterial through residential properties primarily. In addition, the route is <br />adjacent to Peterson Park and Fairfield Elementary School. From west of the UGB to Terry Street, <br />the typical section consists ora two-lane facility with a painted fog line with a posted speed of 45 <br />mph with a four-way stop control at Green Hill Road. From Terry Street to Bertelsen, Royal Avenue <br />is a three-lane section with bike lanes and no parking with a posted speed of 35 mph~ From Bertelsen <br />to Highway 99, Royal narrows to two lanes with bike lanes and no parking. Accesses are typical of <br />residential streets. Without the WEP, using Royal Avenue require an average out of direction of <br />approximately 2 miles per trip. <br /> <br />Roosevelt Bird - Roosevelt Blvd. is north of West 11th Avenue approximately 1.1 miles and <br />functions as a minor arterial from Terry Street to Highway 99. Roosevelt Blvd. has not been fully <br />constructed along this route. Roosevelt currently starts at the west end as a 'Round About' <br />intersection with Terry Street and continues to Danebo as a two lane street with a large drainage (A3 <br />Channel), industrial lands, and prefabricated housing to the south. Affordable {stick built' residential <br />is located to the north along this section. There is no street from Danebo to Beltline at this time. <br />From Bekline to Bertelsen~ Roosevelt Blvd. is a 3 lane section with bike lanes, heavy industrial to <br />the south and a mixture of mobile homes and manufactured housing to the north. From Bertelsen to <br />Seneca, RooseVelt Blvd. continues as a three lane section with a concrete barrier, ditch, and <br />residential to the north and industrial to the south. From Seneca to Highway 99, Roosevelt Blvd. is a <br />5-lane section with bike lanes and industrial properties north and south. <br /> <br />Without the WEP, using Roosevelt Avenue would require an average out of direction travel of <br />approximately 2.0 miles. For through travel, Royal Avenue would need to be used to the north. <br />Terry Street is a limited connector for truck traffic and a percentage of other vehicles due to the <br />traffic calming features that are currently under construction or recently completed along Terry <br />Street. <br /> <br /> West 11th Avenue - West 11 th Avenue currently serves as the extension of Highway 126 into <br /> Eugene as far as Garfield Street from the west, where West 11th becomes one-way westbound. West <br /> 11th is classified as a principal arterial. West 11th Avenue is a 2-lane facility to Danebo with left <br /> turn lanes at Green Hill and Terry Street. From Danebo to the east, West 11th is a 5 lane section <br /> without parking and bike lanes. West 1 lth Avenue has no access control with an average spacing of <br /> One driveway per 75 feet from Beltline Road to Garfield Street and with a posted speed of 45 mph. <br /> Without the WEP, out of direction travel would be less than Roosevelt, Royal, and West 18th <br /> Avenues. However, travel times would be delayed due to congestion. <br /> <br />EXHIBIT 0-2 - FINDINGS 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.