My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTEP, hLATrVES CONS~D- WEP <br /> <br />McDonalds ~d a couple of other businesses. At buildout, this ~ea is anticipated to have 15 <br />acres of Commercials ~d 77 acres o£Medim and High Density Residential. (This <br />development area lies beyond that she~ in Figure 2-6 of the Draft SEIS.) <br /> <br />RoYalIDanebo Commemial/Residentiai Development <br />A Pl~ed mi×ed~use development node at Lis location includes 10 acres of Commercial~ <br />and 30 acres of Medium Density Residential, The property is vacant, and there is no proposal <br />to develop the prope~j. <br /> <br />Located on the north side of Roy~ between Terry and Green Hill, 5 acres of Commercial and <br />20 acres ofMedim Densky Residential is planned. The property is vacant, and there is no <br />proposal to develop the property. <br /> <br />Willow Creek Area <br />The Hyunda~ electromcs manufacturing facility, in the 83 hectare (205 acre) Willow Creek industrial <br />Park, ~s located south of the project vicinity near the intersection of 18th Avenue and W~llow Creek <br />Road. <br /> <br />Development of the Hyundai semiconductor manufacturing facility includes fill~ng 10.4 acres of <br />wetlands located w~th~n the Willow Creek drainage w~th possibly another 11 acres being filled <br />Phase III is ~mptemented. The overall dens[b~ of workers per acre approved for the Hyundai ~hcility <br />~s consistent w~th planned uses ~br the Willow Creek area. <br /> <br />Additional industrial and residential development will be occurring south of West l i th <br /> <br />West Eugene Wetlands <br /> <br />Within the approximately 8,000-acre West Eugene Wetlands Study Area considered in the <br />~+'E~P, 1,800 acres of wetl~ds ~e l~kely m be prese~e~developed~ <br />~ntempersed ~fith ~ co~ci~ ~d ~ndustfia] development. <br /> <br />Amazon Creek ~nhancement Prelect <br />Th~s project w~s completed ~n 1998 and involves creek w~dening and development of a b~ke path <br />south of the ~P alignment be~een Ba~ley H~ll Road ~d the UP~ tracks near Te~y. [t ~s funded <br />through the [ntemodal Surface Trans~fion Efficiency Am ([STEA). <br /> <br />~ ~35 Project <br />~[s projem ~s ~der cons~ucfion where removal of dikes ~d restoration of the floodplain ~s <br />p~ed by the U.S~ Amy Co~s of Engineers (CEE)just no~h of~e projem ~ea between <br />Te~ S~eet ~d Green Hill Road~ BLM~ City of Eugene, ~d CeE designed the projem <br />coordination M~ ~e location of~e ~gment associated w~th ~e Modified Projem of the <br />~P by leaving ~e ~ea open for development ~ a new ~spo~fion <br /> <br />Tax Lot 600 Mitigation Site <br />The Tax Lot 600 wetlan&s m~figation site is located northwest of Terry and the WEP's north <br />alignment option. The Terry Street connection has been moved east to avoid impacting this <br />mitigation site. The Tax Lot 600 project mitigates Green Hill Technology Park development. <br /> <br />~IB~ C~2 - FiNDiNGS 33 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.