Laserfiche WebLink
page 20 of the re~rt states: "In the event that the West Eugene ~Vetland Plan is aruended in the <br />futura to allow for new or Plied roadways or Other projects, the m~agement ~eas Map would <br />be refined accordingly," Therefore, although the Plied Transportation Condor wetland <br />designation had not been applied to the MOdified project alignment at the time the Recreation~ <br />Access~ and EnViromental ~ucation Plan for the West Eugene Wetlands was approved, this <br />plan ac~oWIedg~ the West Eugene Parkway Modified Project aligment as a pl~ed project <br />and provided for ~er refinement of the Plan folloMng mendment to the West Eugene <br />wetlands plan to apply ~e Planned Transportation Condor Wetland designation. <br /> <br />Additional findings demonstrating compliance of the West Eugene Parkway Modified Project <br />aligmq~ent with Goal 8 are set forth in Exhibk "C~I ~ provided by the Oregon Department of <br />Transportation, attached and incorporated herein by this reference: West Eugene Pad, way <br />Modified Project ~ Consistency Mth the Statewide Planning Goals and Transportation Plarming <br />Rule, prepared for ODOT by Mark J. Greenfield. <br /> <br />Therefore~ these amenchments comply with Goal <br /> <br />.Goal 9: .Eco~omiC. D~velop~ ment <br />7b Provide adequate opportunities throughout the state for a variety of economic activities vital <br />to the health, welfare and prosperity of Oregon '$ citizens. <br /> <br />The primary purposes of the West Eugene Parkway, as stated in the Supplemental Environmental <br />lmPact Statement(August I997), include: <br /> Provide a major access~controlled east-west connecting arterial for intra- and inter- <br /> regional:and cit~wvide travel through the western half of the City of Eugene~ between <br /> Highway 126 to the west and the I-5£i-I05 corridor to the east~ <br /> Improve access m the West Eugene industrial area via dire~ct connections with only <br /> strategic cmssroads~ thereby supporting orderly and planned gro~. <br /> Better !~ West Eugene residential areas with downtown, thereby supporting orderly and <br /> pl~ed growth. <br /> Relieve congestion and improve safety on West 11th Avenue, by removing most intra- and <br /> inter-regional and some local traffic from the busiest and most hazardous section of West <br /> 1 tth Avenue. <br /> <br />As documented in the SE!S and s~zed on page 1-I, "These improvements are needed <br />because of deficiencies in the east-west roadway systems which is failing to support efficient and <br /> <br />safe local, ciWwide, and regional movement of ~ople, goods and se~ices ~ough West Eugene. <br />West 11th Avenue from the O~ H~ll area and as far east as Ga~eld Street includes numerous <br />features that impede safe and efficient travel, including: Numerous signals and intersections <br /> Extensive con~merci~ development with direct access to the facility <br />* A complicated connector between West 11th Avenue and the 6t~ and 7th Avenue Couplet <br /> by way of Garfield Street, including two signals and two 90~degree tums <br /> Hig~Y congested conditions, especially d~ng peak traffic hours <br /> <br />Transp!an ~d Metro P1an Amendments <br />E~b~t C - F~d~ngs <br /> <br />Page 7 <br /> <br /> <br />