My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adopted in 1978 by Eugene, Springfield, Lane County and the Lane Transit District. The public <br />reviewed and commented on a draft Environmental Impact Statement (ELS) t%r the project in <br />1985-8& That process determined the general route of the proposed 4-lane roadway, Which was <br />remamedthe West Eugene Parkway. Under the provision of the City Charter that requires a vote <br />on a limited-access throughway, the City Council placed a measure on the ballot in November <br />1986 ~king whether or not the West Eugene ParkWay should be constracted along the east-west <br />route preferred by the City Council. The voters approved the measure. <br /> <br />The project was included in the 1986 TransPlan, which superseded the T-2000 Plan. Although a <br />final EIS was issued in 1990~ subsequent fhnding constraints and environ_mental concerns <br />resulted in phasing the project in four distinct ph~es~ and additional environmental studies to <br />augment the o~ginal EIS work. A draft supplemental ElS was issued for public comment in <br />I997~ and the final supplemental EIS is pending. <br /> <br />On December 2000, Eugene received a letter from ODOT speci~ing land use actions necessary <br />to move forward with the conclusion of the final supplemental Environmental Impact Statement <br />~br the West Eugene Parkway and construction of Unit 1-A of that project. Although state <br /> strative rules do not require completion of land use actions fbr future phases of a project <br />prior to ~ssuance of~ Envirommental Impact Statement, both the federal Bureau of Land <br /> ement (BLM) and the Federal Highway Administration (FHWA) had submitted letters to <br />ODOT stating that all land use actions must be completed prior to issuance of the final <br />supplemental Environmental Impact Statement for the West Eugene Parkway. <br /> <br />In November 2001~ Eugene voters approved a ballot measure directing the City "to pursue <br />~3anding m~d transportation and land use approvals to facilitate construction of the West Eugene <br />Parkway." <br /> <br />Findings demonstrating consistency of the December 2001 revised Eugene-Springfield <br />Metropolitan Area Transportation System PI~ (TransPlan) w/th the Transportation Ptarming <br />Rule were provided a an exhibit to the local jurisdiction ordinances adopting TransPtan. <br />Findings to support the proposed amendments are based, in large part, on the changes to the <br />December 200I TransPlan roadway and bikeway system networks and TransPlan performance <br />meaures resulting from the proposed amendments. <br /> <br />The following provides a summ~ of proposed revisions to the roadway and bikeway system <br />networks resulting from the proposed amendments. <br /> <br />The shifts in road:way projects result in an increase in Arterial and Collector Miles from 351.9 in <br />the December 200! TransPlan to 355.8 wi~ the proposed amendments in Arterial and Collector <br />Miles (excluding freeways) from 315.7 in the December 2001 TransPlan to 319.6 with the <br />proposed amendments. The net change is an increase of 3.9 miles. <br /> <br />These shiRs in roadway projects also require corresponding shifts to the Bikeway project lists: <br />the West Eugene Parkway phases lB and 2A are added to the 20-Year Financially~Constrained <br />Bikeway SYstem list and the following projects are deferred to the Future Bikeway System list: <br /> <br />TranSplan and Me~o Plan Amendments <br />EXhibit C '~ F~nd~gs <br /> <br />Page 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.