My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
land uses consistent with the requirements of this division." <br /> <br />The package of TransPt~ roadway amendments includes moving the Beltline, River Road-Delta <br />project and the Beltline, Stage 3 (Roosevelt to West 11th) project from the 20-Year Financially <br />C°ns~ned to'Way project list to the Future roadway project list. Both the 20-Year <br />Financially~C°nstrained project list and the Furore project list are included in Chapter 3 of <br />Tr~Pl~ the TransP°rtati°n System Plan, and are considered part of the Transpor~mtion System <br />Plan Under the Transportation Planxting RUle. The requirement for adoption of a 20-Year <br />Financially Constrained project list is a federal rather than a state requirement. Although the <br />FUrore Project list is not adOPted by reference as pa~ of the Metro Plan, the. Beltline, River Road- <br />Delta prQect will rem~n a Part of TransPlan in compliance Mth 660~012~0060(t)(b)~ If the <br />Bettl~ne, River Road~Delta pro~ect were proposed for removal from both the 20-Year and Future <br />lists in TranSplan, this remedy would not be met and other remedies would be required for <br />compliance with the OAR 660~012-0060. <br /> <br />As demo~trated by the findings a~ve, while the package of TransPlan mendments will result <br />in a reduction in the 2015 pm peak hour level of service at two of the seventeen locations <br />ev~uated; ret~ning the Beltline, River Road~Delta project and the Beltline, Stage 3 (Roosevelt to <br />West I ith) project on the TransPlan Future list meets the requiremenm of OAR 660-012-0060(1). <br /> <br />Additional findings demonstrating compliance of the West Eugene Parkway Modified Project <br />aI~gmem with Goat 12 and the Transpo~ation Plying Rule are set forth in Exhibit "C-1' <br /> bythe Oregon Dep~ment of Transportation~ attached and incorporated herein by this <br />m : West Eugene Parkway Modified Project - Consistency with the StateMde Plying <br />Goals and Transportation Planning Rule, prepared fbr ODOT by Mark J~ Greenfiel& <br /> <br />these amendments comply with Goal 12. <br /> <br /> ervation <br />To comerve energy. <br /> <br />Findings demonstrating compliance of the West Eugene Parkway Modified Project alignment <br />x¼th Goal !3 are set forth in Exhibit "C-1" provided by the Oregon Depment of <br />TranspOrtation, attached and incorporated herein by this reference: West Eugene Parkw</ <br />Modified Project ~ Consistency w4th the StateMde Planning Goals and Transportation Planning <br />Rule, prepared ~br ODOT by Mark J. Greenfield. <br /> <br /> ization_ <br />To proVide for an orderly and efficient transition f~om rural to urban land use. <br /> <br />Findings ~ng compliance with Goal 14 for the ~rtion of the West Eugene Parkway <br /> Project alignment located within the urban growth boundary and justifying an <br /> nm Goal 14 for the portion of the West Eugene Parkway Modified Project <br />!ocated outside the urban growth bound~ are set forth in the follov~4ng documents provided by <br /> <br />TransP!~ ~d Me~o Plan Amendments <br />E>r&~bit C .~ F~d~gs <br /> <br />Page 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.