My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20284
COE
>
City of Eugene
>
Ordinances
>
2003 No. 20274-20306
>
Ordinance No. 20284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:44:33 PM
Creation date
7/26/2005 5:29:09 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
2/24/2003
Document_Number
20284
CMO_Effective_Date
3/22/2003
Author
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cotmcil initiated proceedings to apply the 'ND Metro Plan diagram designation and/ND Nodal <br />Development Overlay Zone to the Danebo nodal development area. The Metro Plan amendment <br />fkcilkates the application of the nodal development strategy outlined in the policy above and the <br />City is further encouraging nodal development in this area by applying the/ND nodal <br />development overlay zone to all property within the node. <br /> <br />Metro Plan Element F, Policy F.5 states: <br /> <br />Within three years of TransPlan adoption, apply the _ND, Nodal Development designation <br />m areas selected by each jurisdiction, adopt and apply measures to protect designated <br />nodes from incompatible development and adopt a sched~de J:br completion qf nodal <br />development plans and implementing ordinances. <br /> <br />The amendments specifically addresses this policy by applying the ND, Nodal Developmen~ <br />Metro Plan diagran~ and the/ND Nodal Development overlay zone to all properties whhin the <br />Danebo nodal developrnent area. <br /> <br />The City of Eugene has adopted the/ND Nodal Development overlay zone to protect designated <br />nodes from incompatible development. In compliance whh Land Use Policy 5 and the <br />Transportation Plannh~g Rule, the/ND overlay zone contains a list of prohibked auto-oriented <br />uses, does not allow a use to include a drive-through facility and limks the square footage of <br />'building area on the ground floor for new buildings designed to be occupied by rets51 uses. <br />These requirements apply to all new development on vacant land, all new sm~cmres on already <br />developed sites and expansions of 30% or more of the total existing building square footage on <br />the development ske~ wkh the further lknkation that expansion of a structure for a prohibited use <br />or expansion/addition of a drive-through facility as part of the expansion of an existing structure <br />are prohibited. The/ND overlay zone also contains mh~mum residential density requirements <br />tbr land zoned for residential use, minimmn~ floor area ratios for land zoned commercial and <br />industrial, and development standards which apply in addition to the requirements of the base <br />zone~ The/ND overlay zone requkes a minimum residential density' of 8 milts per net acre in <br />new subdivisions in R-1 and R-1.5 zones, 15 units per net acre in R-2, 25 units per net acre in R- <br />3 and 30 units per acre in R-4, These are l:figher than the mbSmum residential denskies in the <br />base zone and slightly higher than the minimum residential denskies assumed in the TransPlan <br />rnodeling (LDR, 7 unks/acre; MDR, 16 units/acre; HDR, 25 unks/acre), 'thereby encouraging <br />concentrations of population, employment and retail activhy that is essential for the development <br />oft'he node, The floor area ratios for commercial and industrial development are kntended to <br />achieve the employment density assumed in the TransPlan modeling (39 employees/acre). <br /> <br />Therefore, the proposed zone change wSll be consistent with applicable provisions of the Metro <br />Plan. <br /> <br />The proposed zone change is consistent with applicable adopted refinemen~ plans. <br />In the event of inconsistencies between these plans and the Metro Plan, the Metro <br /> <br />Exhibit C ~ 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.