My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MovingAhead Spring 2019 Outreach Summary 14 <br />Enhanced Corridor and especially Package A drew more expressions of concern than of approval. For <br />Package A, the emphasis on serving low-income areas was a recurring topic of both concern and <br />approval. For both Enhanced Corridor and Package A, frequently expressed concerns include relatively <br />low improvements in travel time, ridership rates, and safety for people walking and biking. <br />For further insight, the five-point scale was translated to numbers, allowing the packages to be ranked <br />by average score per participant. <br />Package ratings by average score per participant <br />“Works Well” = 5 “Works OK” =4 “Neutral” = 3 “Some Concerns” = 2 “Major Concerns” = 1 <br /> <br />The EmX Package, representing the highest level of investment, had the highest average score. The <br />correlation between investment level and average score was complete, with average scores descending <br />in the same order as investment levels. <br /> <br />2.29 <br />2.78 <br />3.04 <br />3.07 <br />3.09 <br />Enhanced Corridor <br />Package A <br />Package B <br />Package C <br />EmX <br />July 15, 2019, Joint Work Session – Item1
The URL can be used to link to this page
Your browser does not support the video tag.