My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />May 2019 Investment Package Alternatives MovingAhead <br />36 Supplemental Refinement Report <br />Table 3.7 Scores for Each Investment Package <br />Evaluation Measure <br />Enhanced <br />Corridor <br />Package <br />Modified <br />Package A <br />Modified <br />Package B <br />Modified <br />Package C EmX Package <br />Bike/Ped Access and Safety <br />Investments (1-5 rating) 3.0 2.3 3.3 3.9 4.4 <br />Capital Cost (millions) $148 $106 $210 $274 $335 <br />Consistency with Local Plans <br />and Policies (1-5 rating) 3.2 2.6 3.4 3.6 4.4 <br />Investment in Corridors with <br />Higher Level of Low Income <br />and Minority Population <br />56% 59% 79% 50% 50% <br />Number/Acreage of <br />Acquisitions 115 ∕ 4.1 96 ∕ 3.6 131 / 4.9 176 ∕ 8.0 177 ∕ 8.4 <br />Operating Cost: Systemwide <br />Change from No-Build <br />(millions) <br />-$0.1 -$0.7 $5.9 $4.3 $8.2 <br />Parking Impacts: Corridor On- <br />Street and Off-Street Parking <br />Impacts (number of spaces <br />lost) <br />188 119 151 285 375 <br />Potential Property <br />Displacements 4 4 6 8 8 <br />Ridership: Estimated Annual <br />Systemwide Increase <br />Compared to No-Build* <br />389,000 207,000 762,000 771,000 1,327,000 <br />Support Corridor <br />Development and <br />Redevelopment (1-5 rating) <br />3.0 2.2 3.4 3.8 4.6 <br />Support from the Public (1-5 <br />rating) 3.6 3.2 3.4 3.6 3.6 <br />Transit Travel <br />Time Improvement 21% 16% 23% 23% 25% <br />Trees: Number of Medium <br />and Large Trees Impacted 103 36 190 362 432 <br />* It is important to note that, at this stage of the evaluation, “Annual Systemwide Increase in Ridership” has not been modeled <br />for any modified package. For these modified packages, the ridership indicated for the mix and match packages is the sum of <br />the ridership by mode for each corridor, which is a close approximation of the package ridership. After the City and LTD <br />decision makers provide direction on the range of refined investment packages to advance to public hearing, the refined <br />packages will be modeled for annual systemwide ridership. <br /> <br /> <br />July 15, 2019, Joint Work Session – Item1
The URL can be used to link to this page
Your browser does not support the video tag.