Laserfiche WebLink
<br />MovingAhead Investment Package Alternatives May 2019 <br /> Supplemental Refinement Report 35 <br />• Transit travel times improved for Modified Package A (from 13% to 16%) and Modified Package <br />B (from 22% to 23%) while Modified Package C remained the same as the Original Package (23%) <br />• Support from the public is based on the average of the individual ratings for each mode that <br />makes up the investment package (input from the AA comment period): <br />o Modified Package C and the Enhanced Corridor and EmX Packages would all receive the <br />same (3.6) as the original packages, which is also the highest rating of the packages <br />o Modified Package A would receive the lowest overall rating (3.2) which is a slight <br />improvement from the original proposed Package A <br />o Modified Package B would receive a middle range rating (3.4) which is the same as the <br />rating for the original proposed package <br /> <br />July 15, 2019, Joint Work Session – Item1