My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-17-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-17-19
>
Agenda Packet 7-17-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 11:34:18 AM
Creation date
7/9/2019 11:23:57 AM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/17/2019
City_Council_Effective_Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance Exhibit DOrdinanceExhibitD <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1,RA 19-1,Z 19-5,WG 19-3,ST 19-3,and SDR 19-2 April 19,2019 <br />The pedestrian circulation standards are intended to create safe and efficient routes within a site.The <br />subdivision will result in 17 lots and new public streets.The downtown riverfront is envisioned as a <br />walkable,urban neighborhood with buildings oriented to public streets or parkland,thereby creating a <br />public realm that is safe and efficient for pedestrians.The S-DR zone includes street sections and <br />design standards that indicate how streets,sidewalks,and accessways will be designed. <br />The S-DR zone provides an exemption to EC 9.6730(3)(c).Future development will be subject to all <br />other pedestrian circulation standards for the S-DR zone at the time of building permit review.This <br />criterion is met. <br />(d)EC 9.673 5 Public Access Required. <br />All lots in the subdivision have access to existing or proposed public rights-of-way.This is <br />accomplished through the creation of a public street network within the site.Access is provided to <br />Lots 14 and 16 via an access easement that connects to public rights-of-way (i.e.,Local Road 1 and 2} <br />on both ends.Access is provided in a similar manner for the future townhome lots between Mill Street <br />and Mill Alley on Lots 2, 3,and 4.The public street network and access easements are shown in <br />Exhibit B.2 on Sheets C6.0 and C6.1,Street Plan.Therefore,all future buildings or structures on the <br />created lots will have legal access as describe in EC 9.6735.Based on these findings,this criterion is <br />met. <br />(e)EC 9.6750 Special Setback Standards. <br />There are no special setback standards within the project site boundary.This criterion is not <br />applicable. <br />(f)EC 9.6775 Underground Utilities. <br />The subdivision places all new on-site utilities underground concurrent with the planned development <br />to occur within 12 months,unless otherwise exempt pursuant to this provision.The proposal <br />complies with this criterion. <br />(g)EC 9.6780 Vision Clearance Area. <br />The Street Plan (see Sheet C6.0 and C6.1)include notes that describe the required Vision Clearance <br />Areas (VCA)and its application at each proposed street intersection.The subdivision does not include <br />any visual obstructions within the vision clearance area.Tree street placement will be undertaken <br />through collaboration with the City's Urban Forestry staff at the time of public improvement <br />permitting.Tree placement will not infringe upon the clear zones required by the VCA.This criterion <br />is met and will be further enforced at the time of development. <br />(h)EC 9.6791 through 9.6797 regarding stormwater flood control,quality, <br />flow control for headwaters area,oil control,source control,easements, <br />and operation and maintenance. <br />EC 9.6791 through 9.6797 comprises the stormwater standards required for development of all sites <br />within the City.The standards are necessary to fulfill the general purpose of the land use code and to <br />satisfy the requirements set forth in the City of Eugene's federal National Pollutant Discharge Elevation <br />System (NPDES)Municipal Separate Storm Sewer System (MS4)permit.The following findings <br />address conformance with all applicable standards.The findings are based upon the tentative <br />subdivision plans (see Exhibit B.2)and stormwater memo from KPFF,dated March 2019 in Exhibit J. <br />City of Eugene FINAL SUBMITTAL 73July 17, 2019, Work Session – Item 2
The URL can be used to link to this page
Your browser does not support the video tag.