Ordinance Exhibit DOrdinanceExhibitD <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1,RA 19-1,Z 19-5,WG 19-3,ST 19-3,and SDR 19-2 April 19,2019 <br />Bridge Access Path Area <br />Heavy equipment will be necessary to do the rough grading for the walks and new planting areas <br />within the /WR conservation areas for this new path area.This rough grading will establish subgrades <br />for paths,low retaining walls,and planting areas along this upland bank area.Additional heavy <br />equipment may be needed to pour concrete and add soil,but these activities may occur via pumps or <br />blowers from areas at the top of bank,outside of the conservation setback areas. <br />Careful project planning,on-site haul route establishment and construction activity phasing and <br />coordination will prioritize efficiencies and minimizing soil compaction within the /WR conservation <br />areas as excavation and re-grading work is planned and implemented across the project site. <br />Therefore,this standard is met. <br />(b)Petroleum products,chemicals,or other deleterious materials used in <br />the construction process shall not be allowed to enter a stream or <br />wetland that is within a /WR conservation are; <br />The contractor will be required under the construction contract with the City of Eugene to comply <br />with all Erosion Prevention and Hazardous Materials requirements mandated by City Code while the <br />site is under construction.These requirements will be made clear in the construction bid documents <br />and associated contract language issued by the City and the construction contractor will be required to <br />implement these measures under contract with the City. <br />Perhaps more importantly,and as a result of the site's history as an industrial and operations property <br />for the last 100 years,most areas of the Downtown Riverfront site are governed by an Oregon State <br />Department of Environmental Quality mandated Contaminated Media Management Plan (CMMP).Soil <br />toxins on the site are currently understood to be mostly low levels of petroleum contaminants which <br />have been deemed unfit for approvable off-site clean fill.However,the DEQ has agreed that soils on <br />site can be moved around within the site per the CMMP,which includes provisions for regular on-site <br />inspections as the site is excavated and other worker safety provisions.All existing soil will,however, <br />be capped with a minimum of 12"of imported top soil to assure long term plant health and minimize <br />human contact with potentially contaminated native soils. <br />As a result of this additional State-mandated site material management protocol,the limitations of <br />work above the Willamette River ordinary high-water line,and City Code required erosion prevention <br />permitting measures,the proposal will comply with the above standard. <br />Therefore,this standard is met. <br />(5)Filling,Grading and Excavating.Filling,grading and excavating within the <br />/WR conservation area and within areas removed from the /WR conservation <br />area shall comply with the following standards: <br />(a)Filling,grading or excavating of more than 500 square feet must comply <br />with Erosion Prevention regulations for sensitive areas in EC 6.645. <br />The entire Riverfront Park development project will be governed by an Erosion Prevention Permit <br />from the City.This permitting will occur using the provisions of the City's existing 1200C ECM permit <br />with the State of Oregon.Erosion Prevention plans will be included in the contract bid documents and <br />the requirements and practices established therein will be met on site by the construction contractor <br />under contract with the City of Eugene. <br />City of Eugene FINAL SUBMITTAL 92July 17, 2019, Work Session – Item 2