My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-17-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-17-19
>
Agenda Packet 7-17-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 11:34:18 AM
Creation date
7/9/2019 11:23:57 AM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/17/2019
City_Council_Effective_Date
7/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance Exhibit DOrdinanceExhibitD <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1,RA 19-1,Z 19-5,WG 19-3,ST 19-3,and SDR 19-2 April 19,2019 <br />(b)Impervious surfaces that are part of a use approved in accordance with <br />EC 9.4930(3)shall be no larger than the minimum necessary for the <br />approved use.For sites with wetlands,impervious surfaces shall be <br />located as far from the boundaries of locally significant wetlands as <br />practicable.For riparian and upland wildlife habitat sites,impervious <br />surfaces shall be located as far from the line of ordinary high water as <br />practicable. <br />As noted previously,the Riverfront Park spans approximately 1,300 linear feet along the Willamette <br />River between the EWEB Steam Plant and the Peter DeFazio bicycle and pedestrian bridge.A <br />significant section of the Ruth Bascom Trail,Eugene's riverfront bicycle path,runs along the top of the <br />riverbank and is in need of relocation and replacement.The bank itself is steep and also in relatively <br />poor condition with significant basalt rock rip-rap and concrete armoring,blackberries and other non- <br />natives,along with some native species riparian vegetation. <br />In addition to the Ruth Bascom Trail,proposed impervious surfaces include two new overlooks (North <br />Overlook at 5th Avenue and South Overlook near the Steam Plant);pedestrian walks and seat walls;a <br />shade pavilion (5th Avenue);and wood viewing decks and seating structures. <br />As illustrated on Sheets WR 102.1 and WR 102.2,the majority of impervious surface are proposed for <br />construction outside of /WR conservation areas.The only features that extend into /WR conservation <br />areas are the 5th Avenue Overlook,the South Overlook near the Steam Plant,a portion of concrete seat <br />wall between the overlooks,an architectural shade structure,and small portions of the Ruth Bascom <br />Path.The proposed extensions within /WR conservation areas are minimal and responsive to the <br />existing steep bank and non-native and invasive species vegetation along its extent. <br />The proposed impervious surfaces associated with the Riverfront Park design are important <br />components of the public improvements to the Riverfront Park envisioned in the EWEB Master Plan <br />and subsequent design work that was heavily informed by public input and long term downtown <br />planning for decades.The proposed improvements are designed to be fully accessible and provide <br />critical visual access to the Willamette River and the riparian landscape beyond.The overlooks <br />provide key arrival points at the River at the end of view corridors identified as critical design <br />components of the Downtown Riverfront redevelopment site.Landscape areas surrounding these <br />overlooks and associated developed park components are largely planted with native species and the <br />additional riparian bank enhancement area created by reducing the slope of the riverbank between <br />the two overlooks more than mitigates for the areas of impervious surfaces included as improvements <br />in the area. <br />Therefore,this standard is met. <br />(c)Durable porous paving treatments or other infiltration devices <br />approved by the planning director or decision-maker shall be used in <br />lieu of standard impervious paving surfaces to increase infiltration of <br />stormwater where practicable.This standard shall apply only to low <br />volume parking areas,foot paths or lightly used access roads,where <br />porous soils and flat topography will facilitate infiltration of runoff.For <br />the purposes of this subsection,gravel surfaces are not acceptable as <br />porous paving or as an infiltration device. <br />City of Eugene FINAL SUBMITTAL 94July 17, 2019, Work Session – Item 2
The URL can be used to link to this page
Your browser does not support the video tag.