Laserfiche WebLink
Ordinance Exhibit DOrdinanceExhibitD <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1,RA 19-1,Z 19-5,WG 19-3,ST 19-3,and SDR 19-2 April 19,2019 <br />5th Avenue East of Ferry Street 4 <br />Local Road 1 NA 3 <br />Local Road 2 NA 3 <br />Local Road 3 NA 2 <br />While the general design of each street is consistent with the S-DR zone street typologies,specific <br />details of each will be reviewed and approved at the time of public improvement permitting.Based on <br />the findings above,this criterion is met. <br />(c)EC 9.6500 through EC 9.6505 Public Improvement Standards. <br />All new public improvements will be provided consistent with the requirements of the S-DR zone or <br />the City's public improvement design standards manual,as applicable. <br />EC 9.6500 Easements <br />The tentative subdivision plat,utilities plans (water,sewer,stormwater drainage and treatment),and <br />street plan depict the easements needed to ensure adequate provision of public services.These <br />include public utility easements (PUEs)that run with the various infrastructure facilities and access <br />easements to provide alley connections (e.g.,access between Lots 13 and 14),as well as bicycle and <br />pedestrian connections to the riverfront pathway system.Additional easements may also be <br />established separately,and the necessary vacation of any existing or conflicting public easements will <br />occur prior to final plat approval. <br />EC 9.6505 Improvement -Specifications. <br />The proposed subdivision complies with the requirements of this section. <br />Water.Water service will be provided in accordance with Eugene Water and Electric Board <br />(EWEB)policies and procedures.The Water Plan depicts five connections to the existing water <br />system around the site perimeter.Prior to final plat approval the statutorily required water <br />availability letter from EWEB will be obtained. <br />Sewer.Public wastewater is currently available to the subject property and available in the <br />adjacent public rights-of-way.The proposed sewer plan (see Sheets 3.0 and 3.1)depicts a <br />gravity-flow system for the entire site with connections to the existing city facilities at East 4th <br />Avenue and the existing 12-inch main that bisects the northwestern block via the Mill Alley <br />extension. <br />Streets and Alleys.EC 9.6505(3)cross references the standards in EC 9.6870.Those standards <br />are superseded by the S-DR zone street design standards.As noted previously,the proposed <br />street system complies with the applicable S-DR street standards in accordance with EC <br />9.3160.The subdivision also includes a single public alley -an extension of Mill Alley -that <br />complies with the standards of EC 9.3160. <br />City of Eugene 65FINALSUBMITTALJuly 22, 2019, Work Session – Item 3