Laserfiche WebLink
Ordinance Exhibit D <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 April 19, 2019 <br />■ Sidewalks. Similar to the streets and alleys section above, the sidewalk width, placement, and <br />amenities are included in S -DR cross sections. The subdivision complies with the standards <br />included in the S -DR zone (see Sheets C6.2). Trees are shown on the street sections for <br />illustrative purposes. Exact species and spacing will be refined through coordination and <br />permitting with the City's Urban Forestry staff. <br />■ Bicycle Paths and Accessways. The subdivision places access easements over several public <br />accessways that connect to the riverfront pathway system and future riverfront park. The <br />pathways proposed at the eastern ends of Local Roads 1 and 2 meet the 12 -feet minimum <br />width standard at EC 9.3160(6). <br />Construction -level details for all public improvements will be reviewed and approved by the City at the <br />time of public improvement permitting. Based on the findings above, this criterion is met. <br />(2) Approval does not impede the future best use of the remainder of the <br />property under the same ownership or adversely affect the development of <br />the remainder or any adjoining land or access thereto, based on the <br />provisions of this land use code. For subdivisions involving phasing, it shall <br />be demonstrated that each sequential phase will maintain consistency with <br />the provisions of EC 9.8515 Tentative Subdivision Approval Criteria - General. <br />The tentative subdivision does not impede the future use of the adjacent properties, as access is <br />maintained to adjacent public rights-of-way. The existing southern EWEB office building maintains <br />existing access to East 4th Avenue and is connected to the site by the Ferry Street extension. On the <br />southern end of the site, the adjacent substation retains access to the current Hilyard Street railroad <br />crossing and a new access point is provided by Local Road 3. <br />The subdivision covers the entirety of properties under the same ownership. As described under EC <br />9.7010(3), the proposed subdivision is not phased; however, as indicated by the smaller townhome <br />lots, there will be multiple final plats recorded to implement the approved tentative subdivision. Thus, <br />the tentative subdivision will facilitate the future best use of the remainder of the property. The <br />proposal complies with this criterion. <br />(3) Any existing improvements on the proposed lots are consistent with the <br />provisions of this land use code. <br />The site is partially developed with four buildings and paved parking areas. Of the four structures, <br />only the steam plant is being retained. The removal of existing buildings will otherwise occur prior to <br />final plat approval, to ensure no encroachments within proposed lots or rights-of-way. The steam <br />plant is located on Lot 17. When creating lots around existing structures, proposals must comply with <br />setback standards to avoid non -conformities. In the S -DR zone, there is no minimum front or interior <br />yard setback (EC 9.3155(2)); thus, Lot 17 and the existing steam plant siting are consistent with the <br />provisions of this land use code. Future development on Lot 17 is subject to the S -DR development <br />standards at EC 9.3148 regarding adaptive reuse. The proposal complies with this criterion. <br />(4) The proposed subdivision will be consistent with the property's designation <br />in the comprehensive plan and applicable adopted plan policies as reflected <br />in the sections beginning at EC 9.9500. <br />The site has two designations in the Metro Plan diagram. With City Council's adoption of Ordinance <br />no. 20513, the portion of the site west of the Ferry Street Bridge viaduct is designated High Density <br />City of Eugene FINAL SUBMITTAL 66 <br />