My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20619
COE
>
City of Eugene
>
Ordinances
>
2019 No. 20608 - 20624
>
Ord. 20619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 2:41:26 PM
Creation date
7/26/2019 2:37:54 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/22/2019
Document_Number
Ord. 20619
CMO_Effective_Date
8/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance Exhibit D <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 April 19, 2019 <br />and without interfering with the orderly extension of adjacent streets, bicycle <br />paths, and accessways. If the planning director deems it necessary for the <br />purpose of future land division, any restriction of buildings within future <br />street, bicycle path, and accessway locations shall be made a matter of record <br />in the tentative plan approval. <br />The proposed Tentative Subdivision is taking place on property zoned Special Area Zone, Downtown <br />Riverfront (S -DR). This criterion is not applicable. <br />(9) As far as is practicable, lot side lines shall run at right angles to the street <br />upon which the lots face, except that on curved streets they shall be radial to <br />the curve. <br />The majority of proposed lots run at right angles to the streets upon which they face, and others are <br />nearly right angles, as far as is practicable. The downtown riverfront site has unusual geography <br />caused by the adjacent arc of the Willamette River on the east and the railroad to the west. These two <br />features disrupt the rectilinear street grid that runs throughout downtown Eugene. Extensions of <br />existing streets - East 5th Avenue, Mill and Ferry Streets - reestablish the grid and enable lots with <br />right angles. Lots 13, 14, 15, and 16 are generally arranged at right -angles, but the eastern lots will <br />face onto the park while the western lots orient to Local Road 3 or the cross streets of Ferry Street, <br />Local Road 1, and Local Road 2. In all cases, the resultant lots are arranged to run at right angles to <br />public streets or accesses or allow future development on those lots to orient at right angles to the <br />public street or accesses. Based on the findings above, the criterion is met. <br />(10) The proposed subdivision complies with all of the following: <br />(a) EC 9.6706 Development in Flood Plains through EC 9.6709 Special Flood <br />Hazard Areas - Standards. <br />These standards do not apply because the subject property is not located within a special flood hazard <br />area as mapped by the Federal Emergency Management Agency (FEMA). According to the Flood <br />Insurance Rate Maps (FIRM) No. 41039C -1137-F, dated June 2, 1999, portions of the site nearest the <br />Willamette River are in Zone X (see Exhibit L). This classification in this location means the area is <br />within the 500 -year floodplain, but it is beyond the Special Flood Hazard area. The classification <br />recognizes the area is protected by levees from the 100 -year flood event, and it results in a reduced <br />risk from the 100 -year flood event of less than 1 -foot in depth. <br />(b) EC 9.6710 Geological and Geotechnical Analysis. <br />The site analysis has been conducted in compliance with the requirements of EC 9.6710. As per <br />subsection EC 9.6710(2)(b), such an analysis is required of all developments that will construct and <br />dedicate public streets and alleys, drainage systems, and wastewater sewers. The downtown <br />riverfront development will construct and dedicate each of these public infrastructure systems, <br />thereby initiating the requirement to conduct an analysis. The tentative subdivision is relatively flat, <br />lacking any slopes that are greater than 10%. As per subsection EC 9.6710(5), a Level 1 analysis is <br />required of all development sites with slopes less than 10% that include construction of public <br />improvements, as is the case within the tentative subdivision project boundary. <br />The analysis is included as Exhibit I to the overall document. <br />(c) EC 9.6730 Pedestrian Circulation On -Site. <br />City of Eugene FINAL SUBMITTAL 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.