Laserfiche WebLink
Attachment G <br />14. Bettman On page 138 there is $590K secured for Parking Garage Elevator CS-Facilities <br />upgrades to the Over Park and Hult (not broken out separately.) I <br />remember the Overpark elevator being rebuilt and it wasn’t that long <br />ago. Why should it need such expensive “upgrade” so soon? <br />The $590,000 elevator project is for the Overpark, Hult, and Parcade garages. In addition to the newer elevator <br />and stair tower at the Overpark, there are six other elevators in these three facilities. The average age of these <br />facilities is over 25 years and repair/replacement parts are becoming more difficult to acquire. These upgrades <br />are recommended by the Elevator Modernization Report in an effort to anticipate and avoid breakdowns. <br />15. Bettman Many project categories have increased by hundreds of thousands, CS-Facilities <br />like Primary Building Systems by 356 K, Secondary Building <br />Systems by 69K, etc. Where is the increase in the capital budget <br />coming from? Is it an increase in the Capital (transfer) contribution? <br />Yes, the overall increase in these projects reflects the annual $100,000 increase in the General Fund Capital <br />Budget, as described on page 126 of the CIP. This annual increase is allocated among the General Fund CIP <br />projects, including the Site Renovations and Rehabilitation project listed in the Parks and Open Space section of <br />the CIP. <br />16. Bettman There are many millions grouped in capital project categories and sub CS-Facilities <br />categories, i.e. General Site and Facility Improvements 1.7, Health <br />Safety and Welfare 3.9, Primary Building Systems 5.9, Secondary <br />Bldg systems 1.2, Building Service Systems4.2. These are in addition <br />to the many upgrades, maintenance and preservation projects <br />specifically listed. Is there a list of planned projects for this money <br />that we can look at? Is this a rolling fund? <br />These amounts represent the Public Building and Facilities General Fund Capital Improvement Program for <br />these types of building preservation projects. These funds are dedicated to repairing and preserving the City's <br />111 General Fund-supported buildings, while the other named projects fund preservation of non-General Fund <br />buildings. The General Funds in each of these "Preservation and Maintenance" and "Site and Facility <br />Improvements" sub-categories are tracked separately and allocated to specific projects during the fiscal year, <br />based on the Facility Condition Report (FCR) and on emerging deficiencies that need more immediate attention. <br />The 2004 FCR documented $16.2 million in existing deficiencies, and $12.7 million in deficiencies emerging <br />within 5 years. This $28.9 million in expected needs compares with a total of $19.9 million in General Fund <br />resources included in the draft CIP. The next update of the Facility Condition Report will be done in FY08. <br />The Executive Summary of the 2004 Facility Condition Report can be read at the Facility Management <br />Division's web site, and the full report with detailed information on the specific deficiencies of each building is <br />available at the Library, City Manager's Office or the Facility Management Division office. <br />17. Bettman There is 3 million allocated to Services for New Development. Will CS-Facilities <br />that money be spent on projects that enhance capacity that are <br />identified in the CIP? Is the SDC money shifted to pay for <br />infrastructure associated with a development project not identified as <br />a community priority? <br />