Laserfiche WebLink
<br />1. Capacity - Projects or portions of projects that are related to increasing liquids andf or <br />biosolids conveyance, treatment, and disposition capacity beyond existing design <br />standards (i.e., projects that provide the next capacity increment within the planning <br />period). <br /> <br />2. Performance. ImprQvements - ProJects that increase system capacity by increasing the <br />level of performance provided by facilities. Unlike' capacity' projects that relate only to <br />the next increment of capacity, performance upgrades are generally sized based on. total <br />projected capacity needs at the end of the planning'period (existing and future). <br /> <br />3. Rehabilitation -'Projects designed to remedy an existing system deficiency and do not. <br />enh~ce system capacity. <br /> <br />Capacity and performance upgrade projects can be new facilities, orupgradef expansion of <br />existing facilities. Rehabilitati~n projects are the replacement of outdated or worn out <br />eqmp.ment or faciliti~s. - <br /> <br />The majority of the projects' will typically fall completely into one project type. However, <br />some' projects may be split between capacity and 'performance types. The general criteria for. <br />allocating projects to the above categories are sho.wn in Table 5. -These criteria should be <br />applied in the development of specific projects for iI1.clusion in the appropriate planning' <br />document 'o~ project list and should be considered and evaluated as part of the process of <br />adoption of such a plan or project list. ' <br /> <br />TABLE 5 <br />Summary of Project Type Allocation Criteria <br /> <br />Perfonnance Improvements <br /> <br />Potential Criteria <br /> <br />Adds new facilities/expands existing facilities <br /> <br />-Provides new liquids treatment or biosolids capacity beyond existing <br />system design standard or beyond the current pennitted capacity <br /> <br />Adds new fa~ilitieslimproves existing facilities <br /> <br />Provides capacity/enhanced capability sized f~r total Mure capacity . <br />ne~ds <br /> <br />Driven by new regulatory requirement <br /> <br />Driven by increase in community perfonnance standard <br /> <br />T echnologieal efficiencies <br /> <br />Replaces existing facility or portion of facility <br /> <br />Does not serve growth either through existing available or new <br />capacity <br /> <br />Preserves existing facil'ity performance/capacity <br /> <br />Project Type <br />Capacity <br /> <br />Rehabilitation <br /> <br />Once project costs have been allocated to system component and project type categories, <br />and the ~osts have been distributed to the system capacity parameters, the final step in the <br />project cost allocation process is to assign costs to user types. For the purposes of the SDC <br />methodology, there are two user types: 1) existing customers, and 2) new customers or <br />. growth. Costs that are allocated to growth are incorporated into the SDC improvement fee <br />