My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 9-9-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2019
>
09-09-19
>
Agenda Packet 9-9-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 4:44:18 PM
Creation date
8/30/2019 4:43:14 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
9/9/2019
City_Council_Effective_Date
9/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Existing PAL 1 PAL 2 PAL 3Landside/Roadway SystemAccess RoadwaysLoop Road IntersectionCurb RoadwayPublic ParkingEmployee ParkingRental Car Ready-Return/Service Area <br />Landside/Roadways <br />Landside/roadway facility requirements analysis reveals a need for additional parking capacity, improved roadway access safety, expanded rental car facilities, and solutions to address congested terminal curb road activity during peak times. The first step to address roadway safety and parking capacity is accomplished through expanding the terminal loop road. This increases available undeveloped space within the loop road to accomodate parking demand and eliminates the left turn entry to the terminal loop road from Northrup Drive. The intersection is replaced with a roundabout which forces reductions in speed prior to reaching the terminal curb and parking access while still allowing free flow of traffic to terminal and general aviation facilities. A bypass road is created to serve parking facilities and eliminate the need for rental car patrons to traverse the terminal curb road unnecessarily. A new cell phone lot conveniently located along Northrup Drive also eliminates unneccesary curb congestion and improves the passenger pickup experience. A commercial vehicle (CV) staging lot is programmed to provide a holding location for taxis, buses, and other forms of ground transportation. Overall, the landside/roadway plan accomodates forecast demand through PAL 3 and aligns with the airport development vision. <br />Note: Effective October 2017, the former overflow lot has been reprogrammed as Economy parking with shuttle service provided to the terminal building. <br />Page 17
The URL can be used to link to this page
Your browser does not support the video tag.