10 <br />0 500'500' 250' <br />Short-Term Projects (2018 - 2022) <br />Mid-Term Projects (2023 - 2027) <br />Long-Term Projects (2028 - 2037) <br />Legend <br />ARFF Vehicle* <br />SRE Vehicle* <br />Taxiway A1-A5: Phase I - Design and Environmental* <br />Fuel Storage Facility: Phase I - Design and Environmental* <br />Fuel Storage Facility: Phase II - Construction and Decommission of Old Facility <br />Terminal Roof Replacement <br />Taxiway A1-A5: Phase II - Construction <br />EA - Runway 34R Wetland Fill for Wildlife Hazard* <br />Reconstruct Terminal Taxiways: Phase I - Design and Environmental* <br />Advanced Terminal Planning Study* <br />Stormwater Master Plan - Basins B and C* <br />Reconstruct Terminal Taxiways: Phase II - Construction <br />EA - Terminal Area and Landside Facilities* <br />Runway 34R-16L Rehabilitation: Phase I - Design and Environmental* <br />Runway 34R-16L Rehabilitation: Phase II - Construction <br />Runway 34R Wetland Fill for Wildlife Hazard <br />New Rotating Beacon and Removal of Old Beacon <br />Landside Roadway, Parking and Rental Car Improvements <br />New Landside Equipment and Materials Storage Facility <br />Mitigate Asbestos in Old Air Traffic Control Tower <br />Taxiway C/M Rehabilitation: Phase I - Design and Environmental* <br />Taxiway C/M Rehabilitation: Phase II - Construction <br />Demolish Old ATCT, Old Landside Equip/Materials Storage, and Friendly Hangar <br />Employee Parking Lot Construction and Reconfiguration <br />TSA Office Relocation and Demolition <br />Ticketing, Airline Ticket Offices, and Outbound Baggage Area Expansion <br />New Terminal Concourse (includes PBBs, Charter, and Admin) <br />New Terminal Concourse Apron <br />Short-Term Projects (PAL 1) <br />EA - Airfield and Support Facilities* <br />Relocation of Taxiway B2 and Taxiway R <br />Acquire Land Runway 16R RPZ 5 Acres* <br />Runway Designation Change - All Runways* <br />New North General Aviation/Corporate Area (Hollis Lane) <br />Acquire Land for Green Hill Road Realignment <br />Terminal Curb Road Widening and Commercial Vehicle Staging Lot Expansion <br />Runup Pad - Taxiway A/Runway 34L End <br />Airport Master Plan Update* <br />Mid-Term Projects (PAL 2) <br />EA - Terminal Area, Airfield, and Landside Facilities* <br />Deicing Facilities and Segmented Circle Relocation <br />Runway 16R-34L Rehabilitation <br />Replace Runway 34L VASI with PAPI (LED) Approach Guidance System <br />Landside Vehicle Parking Expansion* <br />Construct Vehicle Access Tunnel Under Taxiways C and M <br />EA - Terminal Area* <br />North Ramp General Aviation Hangar Removal <br />New Terminal Concourse Expansion (Including PBBs) <br />New Terminal Concourse Apron Expansion <br />Runway 16L RPZ Land Acquisition* <br />EA - Primary Airfield and Landside Support Facilities* <br />Taxiway L and Taxiway J Construction <br />Rental Car Maintenance Garage* <br />Taxiway B Reconstruction and Shoulder Paving <br />Long-Term Projects (PAL 3) <br />Development Phasing Plan <br />2 <br />3 <br />4 <br />5 <br />31 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />32 <br />33 <br />34 <br />35 <br />37 <br />38 <br />39 <br />41 <br />43 <br />44 <br />45 <br />46 <br />47 <br />49 <br />50 <br />51 <br />52 <br />54 <br />1 <br />55 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />40 <br />56 <br />57 <br />58 <br />Notes: <br />(1) "*" denotes project is not in graphic. <br />(2) Pavement Management Plan Update is a project occurring every <br />three to four years and is not depicted on this graphic. Phasing <br />order numbers are; <br />29 <br />6 30 36 42 48 53 <br />5 <br />7 <br />8 <br />13 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />23 <br />2428 <br />25 <br />262729 <br />32 <br />32 <br />35 <br />37 <br />38 <br />39 <br />43 <br />44 <br />45 <br />47 <br />50 <br />51 52 <br />56 <br />58 <br />EUG Development Phasing Plan <br />Page 20