Laserfiche WebLink
Figure 5-1: Length of Existing and Proposed Trail System by Classification <br />Pedestrian <br />24.2 miles 7.2 miles 9.1 miles <br />40.5 miles (All Existing Trails) <br />Shared-Use <br />Compatibility Study <br />Running* Ped. to Shared-Use <br />7.4 miles 50.6 miles 11.4 miles 4.7 miles <br />69.4 miles (All Proposed Trails) <br />* Total does not include the 3.5 mile reconstruction of the Upper Amazon Running Trail (Project #42), which is <br />included in the Existing Trails tally. <br />5.2 Proposed Trails <br />The trail projects listed in Figures 5-2 and 5-3 below include a description of all proposed new shared- <br />use trails, pedestrian trails, and running trails. The locations of the proposed trails shown on the Trails <br />Plan Maps are conceptual and will be refined based on supplemental analysis, land availability, and <br />voluntary landowner participation. The proposed projects have been broken out into the following two <br />categories: <br />• Proposed Trail Segments: These are proposed projects that will be located on land already owned by <br />the City or where the approximate alignment is known. These projects are listed in the table in <br />Figure 5-2. The trail projects in this table are not in priority order (see Figure 5-6 for prioritization). <br />• Proposed Shared-Use Corridors: These are proposed projects where the exact alignment is not yet <br />known and will ultimately be determined based on future analysis and land availability. These <br />corridors will be shared-use and accommodate both bicycle and pedestrians on either a single <br />shared-use trail or on separate parallel trails. These proposed Shared-Use Corridors are listed in the <br />table in Figure 5-3. The trail projects in this table are not in priority order (see Figure 5-6 for <br />prioritization). <br />Figure 5-2: All Proposed Trail Segments <br />Segment Type Extent* Length** Description <br />1 Shared-Use Wild Iris Ridge 7,800 If Connector trail from planned trail head on Bailey Hill Road <br />Trail (north end) to the existing trail system at Wild Iris Ridge and Bailey <br />View Drive. Design and construction scheduled for 2016. <br />Includes trailhead at Bailey Hill Road. <br />2 Shared-Use Wild Iris Ridge 5,300 If Future Ridgeline Trail segment through Wild Iris Ridge. <br />Trail (south end) <br />3 Pedestrian South Eugene 2,300 If Northern edge of South Eugene Meadows Park. <br />Trail Meadows <br />4 Shared-Use South Eugene 9,700 If Connection from the existing Ridgeline Trail at Willamette <br />Trail Meadows Street to Blanton Road through South Eugene Meadows. <br />5 Pedestrian Spur trail from 1,100 If Pedestrian trail from the Ridgeline Trail, extending north to <br />Trail Ridgeline Trail Blanton Road on the north side of the City owned park <br />at Blanton property. This will allow for improved neighborhood <br />Road connectivity to the Ridgeline Trail. <br />6a Shared -Use Ridgeline Trail 9,500 If Evaluate options for accommodating pedestrians and <br />Compatibility -Blanton Road bicycles within the corridor through a parallel trail system <br />Study to Willamette or upgrade of pedestrian-only trail to shared-use trail. <br />St. <br />Eugene Trails Plan -2018 Page 27