Laserfiche WebLink
Segment Type Extent* Length** Description <br />6b Shared-Use Ridgeline Trail 10,500 If Evaluate options for accommodating pedestrians and <br />Compatibility -Willamette bicycles within the corridor through a parallel trail system <br />Study St. to Fox or upgrade of pedestrian -only trail to shared-use trail. <br />Hollow <br />7 Shared-Use Brookside Dr. 700 If Connector trail from Brookside Drive to the Ridgeline Trail <br />Trail (improve user trail) <br />8 Shared-Use Brookside Dr. 600 If Connector trail from Brookside Drive to the Ridgeline Trail <br />Trail (improve user trail) <br />9 Pedestrian Mariposa 2,300 If Neighborhood connector trail from Donald Street to the <br />Trail Woodland existing Ridgeline Trail. Access easement may be required <br />along power corridor for short segment near Donald <br />Street. <br />10 Pedestrian West Branch 1,100 If Neighborhood connector trail from proposed West <br />Trail Amazon Creek Amazon Drive shared-use path to Pine Forest Dr. <br />11 Share-Use Amazon 200 If Shared-use connector trail to provide access from <br />Trail Headwaters to Headwaters Trail to Fox Hollow Road for mountain bike <br />Fox Hollow bypass to Owl Road and Mariposa Woodland. <br />Connector <br />12a Pedestrian Spencer Butte 3,500 If New trail on the west side of Spencer Butte connecting the <br />Trail Park (west main parking lot with the Ridgeline Trail. This trail segment <br />side) would complete a loop option around Spencer Butte. <br />12b Pedestrian Spencer Butte 1,300 If New north side summit trail spur that would connect the <br />Trail Park (north proposed west side trail (#12a) with the summit. This trail <br />side summit) could be designed using the 'explorer trail' standard, and <br />would wind through the rock outcrops near the summit. <br />13 Shared-Use Amazon Area 3,100 If Shared-use trail along the BPA power line corridor from <br />Trail the Ridgeline Trail to the Headwaters Trail. This could be a <br />return route if headwaters trail is re -designated as an <br />uphill only mountain bike route. <br />14 Shared-Use East Amazon 3,900 If Connection from Ridgeline Trail to lower Dillard Road with <br />Trail Headwaters a spur trail to Nectar Way . The northern portion may <br />include a single-track trial for mountain bikes. <br />15 Pedestrian Mount Baldy 1,800 If Neighborhood connector trail from Ridgeline Trail to Old <br />Trail Dillard Road. Land acquisition or access easement required <br />along a portion of this segment. Currently used as an <br />unofficial/unimproved trail. <br />16 Pedestrian Mount Baldy 1,400 If Trail connection near Mount Baldy between proposed <br />Trail trails 15 and 17. Currently heavily used as an <br />unofficial/unimproved trail. <br />17 Shared-Use Ridgeline Trail 1,000 If Neighborhood connector trail from Ridgeline Trail near <br />Trail to Skyline Park Spring Blvd. to Skyline Park Loop on City owned park land. <br />Currently heavily used as an unofficial/unimproved trail. <br />18 Shared-Use Suzanne Arlie 9,200 If New Ridgeline Trail extension through Suzanne Arlie Park <br />Trail Park along the ridgetop on the northern edge of the park. <br />19 Share-Use Suzanne Arlie 20,500 If Multiple shared-use, pedestrian-only, and single-track <br />Trail with Park mountain bike trail connections from the proposed <br />possible Ridgeline Trail extension (#18) through the park. Park will <br />additional also be considered for siting of bike park with features <br />single-track such as skills park and cyclocross track. Exact location of <br />trail for trails and facilities will be refined trough a future master <br />mountain planning process with the goal of creating multiple loop <br />bikes options for hikers, mountain bikes, and possibly <br />Page 28 Eugene Trails Plan -2018