My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-19-05
COE
>
City of Eugene
>
Administrative Orders
>
2019
>
Admin Order 58-19-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 2:26:28 PM
Creation date
9/9/2019 2:25:32 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Segment Type Extent* Length** Description <br />33 Running Trail East Bank Path 7,200 If Running trail parallel to existing shared-use path along the <br />Willamette River from Owosso Bridge to Delta Ponds. <br />34 Pedestrian East side of 1,400 If Pedestrian trail parallel to Dedrick Slough from the existing <br />Trail and Dedrick Delta Ponds trail network to the signalized crossing at <br />Bridge Slough Goodpasture Island Road (site to avoid floodplain). Trail <br />project would include bridge over Dedrick Slough in Delta <br />Ponds Park . Bridge would complete a barrier free loop at <br />Delta Ponds. <br />35 Pedestrian Melvin Miller 1,100 If Trail connection through Melvin Miller Park from 27 th <br />Trail Park Avenue to Bowmont Drive . <br />36 Pedestrian Videra Creek 1,800 If Trail connection along north side of Videra Creek from <br />Trail Blacktail Drive to Hawkins Lane. <br />37 Running Santa Clara S,3ob If One-mile running trail loop to be incorporated into Santa <br />Trail Park Clara Park with possible connection from Madison Middle <br />School. Exact location will be based on future site planning <br />for the park. <br />38 Shared-Use Kalapuya High 3,400 If Connector trail from Kalapuya High School to proposed <br />Trail School trail corridor C9 at Dragonfly Bend. Trail could be <br />incorporated into a future development plan for this area. <br />39 Barrier-Free Spencer Butte 1,000 If Barrier-free trail from the Spencer Butte parking lot <br />Pedestrian Park through 'Picnic Meadow' with a connection to the existing <br />Trail summit trail to form a loop option. The trail would be <br />surfaced to allow use by wheelchairs and would not <br />exceed an 8 percent grade. <br />40 Shared-Use Berkeley Park 800 If Trail connection from Berkeley Park to the Fern Ridge <br />Trail Path. Land acquisition or an access easement would be <br />needed along a portion of the trail. <br />41 Shared-Use Murray Hill 5,100 If Trail would be located mainly on City owned park land <br />Trail from Gimp! park and would accommodate a portion of the planned <br />Hill Road to Ridgeline Trail, providing access to Murray Hill . <br />Willow Creek <br />Road <br />42 Running Upper 18,500 If The existing Upper Amazon Running Trail will be <br />Trail Amazon reconstructed to improve surfacing and drainage. This is <br />Reconstruct Running Trail scheduled to be completed as part of the planned Amazon <br />from Hilyard Active Transportation Corridor Project, scheduled for <br />Street to 2018. <br />Martin Street <br />43 Pedestrian Proposed trail 5,000 If These include various trails proposed in the 2005 Skinner <br />Trail segments on Butte Park Master Plan on the east and south side of the <br />Skinner Butte butte (exact extent and alignments to be determined). <br />44 Running Bethel 2,600 If Half-mile running trail loop to be incorporated into Bethel <br />Trail Community Community Park, starting and ending at the playground. <br />Park <br />45 Pedestrian Wild Iris Ridge 8,800 If To be constructed in conjunction with The Nature <br />Trail to Murray Hill Conservancy across the Willow Creek Preserve . This trail <br />Park would be subject to TNC rules for use and would <br />potentially be closed seasonally with dogs not permitted. <br />*Trail locations may vary based on availability of land and additional site analysis. <br />**Lengths are approximate and will vary depending on final alignment. Length shown is in linear feet (If) <br />Page 30 Eugene Trails Plan -2018
The URL can be used to link to this page
Your browser does not support the video tag.